Browse
Search
Agenda - 11-30-94 - C-2 (a,b,c)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 11-30-94 Public Hearing
>
Agenda - 11-30-94 - C-2 (a,b,c)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2016 3:59:24 PM
Creation date
11/8/2016 3:53:27 PM
Metadata
Fields
Template:
BOCC
Date
11/30/1994
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-2 (a,b,c)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
water treatment plant. Flynt Industries, which uses approximately 500,000 <br /> gallons per day, is the only existing industry served by Hillsborough which <br /> exceeds the proposed threshold. <br /> A proposed revision to Section 2.4 (Environmental Factors) is included to <br /> implement this recommendation. (Attachment 7) <br /> Options to Address Issues on Which Consensus was not Reached <br /> The Work Group did not reach consensus on whether or not water and sewer service <br /> should be extended to serve the south side of I-40. The southernmost boundary of <br /> any sewer service from Hillsborough would be the ridgeline forming the boundary of <br /> the Cates Creek drainage basin. <br /> The Work Group identified the following options and possibilities: <br /> 1. Limit public water and sewer service to the north side of 1-40, delaying <br /> extensions to the area south of I-40 until specified development thresholds are <br /> met. Development thresholds discussed by the Work Group included <br /> specifying a percentage of area within the remainder of the EDD which must <br /> be developed or planned, or specifying a time period which must pass, after <br /> which the issue could be revisited. In the interim, allow alternative <br /> wastewater disposal systems on the south side of I-40. <br /> Discussion of the Work Group on this issue focused on the perception held by <br /> some citizens that the extension of public services to the south side of I-40 <br /> would create development pressure at the intersection of 1-40 and New Hope <br /> Church Road,resulting in extension of water and sewer service from OWASA <br /> through the Rural Buffer. <br /> Terms of the Joint Planning Agreement between Orange County, Chapel Hill <br /> and Carrboro, and the Orange County Water and Sewer Policy currently <br /> prohibit extensions into the Rural Buffer except as necessary to address a <br /> public health emergency or serve an essential public service, such as a school. <br /> Concern was expressed that future development pressure in or near the Rural <br /> Buffer could result in changes to the Agreement which could compromise the <br /> Rural Buffer. <br /> An example of a development threshold is to limit public water and sewer <br /> service to the north side of I-40, delaying extensions to the area south of I-40 <br /> until at least seventy-five (75%) of the gross land area on the north side of I- <br /> 40 consists of any combination of the following: <br /> • Residential areas in Secondary Development Areas are developed or <br /> site specific development plans (site plans or preliminary subdivision <br /> plans) are approved for development at a density of at one unit per <br /> acre or less; <br /> • Streets,roads,and utility easements located outside of lot boundaries; <br /> and/or <br /> • Lots or tracts used and/or site specific development plans (site plans <br /> or preliminary subdivision plans) are approved for permitted <br /> commercial, industrial, institutional or governmental purposes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.