Browse
Search
Agenda - 04-19-2007-2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 04-19-2007
>
Agenda - 04-19-2007-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:18:13 AM
Creation date
8/28/2008 11:37:23 AM
Metadata
Fields
Template:
BOCC
Date
4/19/2007
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 20070419
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />The consultant estimates that a CUP application for Phase I using one <br />of the options above could be submitted by May 18. Pending direction <br />from the Board at this worksession, an item could be placed on a <br />subsequent Board agenda to authorize staff to submit the CUP <br />application, and request "expedited review." <br />g. Timetable of Next Steps <br />Since the project lacks sufficient funds to build Phase I at this time, an <br />alternative scenario would be to: <br />1. Continue with the design and CUP application, and submit the <br />application for a Phase I that includes all four fields. <br />2. Funds for this project would not be needed immediately, which may <br />allow for utilization of these monies for investigation and installation <br />of artificial turf on existing-fields, such as Smith Middle School. <br />The determination of funding for the more-complete Phase I of Twin <br />Creeks would be addressed in the fall as part of the CIP discussions. <br />Park Design Updates <br />1. New Hope Park at Blackwood Farm (master plan nearing completion) <br />2. Hollow Rock Access-Area Master Plan (multi jurisdictional committee to <br />begin work?) <br />3. Millhouse Road Park (develop a Preliminary Concept Plan to reflect <br />general ideas of what is planned?) <br />4. RiverPark (part of Justice Facilities Expansion Project) <br />5. N.C. Mountains-to-Sea Trail (IPWG to consider principles, need to <br />schedule consideration of proposed corridor in fall 2007) <br />
The URL can be used to link to this page
Your browser does not support the video tag.