Orange County NC Website
0 <br />3. Fairview Park (Phase II) <br />a. Status Report <br />1. RFP for engineering and design has been submitted. <br />2. Playground installation is underway. <br />b. Timetable of Next Steps <br />1. Engineering/design consultant recommendation -May <br />2. Contract award for engineering/design -June 12 <br />3. Engineering, site plan prepared and approved -November <br />4. Construction drawings and bid documents created -March <br />2008 <br />5. Bids solicited and reviewed -May 2008 <br />6. Award bid for construction -June 2008 <br />7. Park construction -July 2008 -June 2009 <br />- 8. Park opening -late-summer 2009 (except baseball field) <br />