Browse
Search
Minutes 09-15-2016
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2016
>
Minutes 09-15-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 8:17:31 AM
Creation date
11/3/2016 8:17:16 AM
Metadata
Fields
Template:
BOCC
Date
9/15/2016
Meeting Type
Municipalities
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> PROJECT <br /> Efland Sewer to Mebane, Phase 2 Extension <br /> ESTIMATED CONSTRUCTION COST <br /> $3,961,000 (BUDGET = $4,973,000) <br /> PROJECT TIME LINE <br /> ➢ Orange County has begun to transfer to Mebane the previously-completed phases of <br /> utility construction, as well as the maintenance of the subject system for the Central <br /> Efland Phase 1 & 2 areas shown on the Capital Projects Exhibit. This is all consistent <br /> with the original and later-amended joint utility service agreement. <br /> ➢ Much of the more recent water and sewer infrastructure work has been for economic <br /> development purposes in designated EDD zones. <br /> ➢ Over $5 Million of`backbone' water and sewer infrastructure has been completed. <br /> ➢ Morinaga was able to use one of the earlier infrastructure phases. <br /> ➢ An additional $8 million is in process that will facilitate additional economic development <br /> potential and will permit the existing sewer flow from Efland to be transferred to Mebane. <br /> ➢ This funding includes approximately $3 million to serve EDD Zones D2, D3, D4 & E1, as <br /> depicted on the Capital Projects Exhibit, subject to development trends. <br /> ➢ The design has been coordinated with the City of Mebane and their engineers, Alley, <br /> Williams Carmen & King. <br /> Howard Fleming said the following information is a correction to the timeline contained <br /> within the abstract for this item: <br /> ➢ The Efland Sewer to Mebane, Phase 2 Extension project construction documents are <br /> expected to be completed over the next few months. <br /> ➢ We expect project bids in early 2017. <br /> ➢ Due to its complexity and scope, project construction will take approximately 15 months <br /> to complete <br /> ➢ The current target for completion is summer of 2018. <br /> AS TO THE SCOPE OF SERVICES FOR THE PHASE 2 EXTENSION PROJECT <br /> The project overview is depicted on the 2-page BOCC Exhibit and generally consists of the <br /> construction of the following elements: <br /> • Approximately 8,300 linear feet (1.6 miles) of gravity sewer (8" & 12") plus two (2) add <br /> alternates — 8" sewer lines to facilitate service (no connections) to the residences on Mt. <br /> Willing Rd. & Center St. north of 1-40/85 and south of Turner St., which we hope to be <br /> able to include in the project, depending on the outcome of the bids. <br /> • The project includes bore &jack installations under the railroad tracks, Mt. Willing Road, <br /> 1-40/85 and West Ten Road. <br /> • A submersible sewage pump station (700 gpm) along West Ten Road. This is <br /> strategically located to provide a future downstream connection point for a future <br /> extension to serve EDD Zones D2, D3 & D4, as depicted on the Capital Projects Exhibit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.