Orange County NC Website
~~ <br />Determination of Projects Costs <br />The BOC may include in the determination of the cosfi of the project <br />• Construction costs (including engineering and construction administration <br />services) <br />• Cost of necessary legal services, <br />® The amount of interest paid during construction; <br />• The cost of rights-of--way, and <br />• The cost of publishing and mailing,notices and resolutions., <br />11 <br />