Browse
Search
Agenda - 04-12-2007-4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 04-12-2007
>
Agenda - 04-12-2007-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:47:13 PM
Creation date
8/28/2008 11:36:11 AM
Metadata
Fields
Template:
BOCC
Date
4/12/2007
Document Type
Agenda
Agenda Item
4
Document Relationships
Minutes - 20070412
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />Assessment Policy Applicable to Water and Sewer <br />Extensions to Existing Unnerved Neighborhoods <br />May 27, 1999 <br />Page 2 <br />Carolina General Statutes 153A, Article 9, Special Assessments. <br />Costs recovered through assessments shall not include the engineering design and construction <br />observation expenses in an amount up to 1~5% of total expenditures for a given project Costs <br />recovered through assessments shall not include the legal expenses in an amount up to 5% of total <br />expenditures for a.given project. Any suchengineering design and observation costs in excess of <br />15%. and/or legal costs in excess of 5°1o will be included in• the summation of costs to be assessed. <br />Costs recovered through assessments shall not include off-site costs, including. an~ easement <br />acquisitions of intervening improvements required to connect assessment projects situated within <br />the incorporated limits of Chapel Hill and Carrboro when the OWASA Board of Directors <br />determines that (a) the off site improvements are.assessed to intervening benefitted properties; or, <br />the cost of the off site improvetneuts are •reasonably anticipated ~to be recovered within the next 10 <br />year ~~period through fees from service .connections or ~extensitons to the proximate intervening. <br />properties; and (b) the costs of the off-site improvements that are not ~ assessed' are in reasonable <br />relationship to the costs of the assessment project and funding is available in the approved Capital <br />Improvements Budget for..such.off-site eost,~or.~imds~are.~reliably available from otliet sources such <br />as grouts, subsidies or contn`butions in aid of construction from private or public •parties. <br />The exclusion of off-site costs for assessment projects situated outside of incorporated areas but <br />within the Urban Service Areas of Chapel Hill and Carrbom shall be determined by the OWASA <br />Board of Directors for each such project <br />Exclusion of off-site costs shall not apply to assessment projects situated outside •the~ Urban Service <br />Area of Chapel Hill and Caribom. <br />Off-site mains shall be defined as those sections of mains installed outside of the benefited project <br />area which do not provide service directly to individual lots within the benefited area and are of a <br />size so as to provide service to areas other than that defined by the assessment project resolution_ <br />Upon completion of the project, property owners will be notified and a Final Assessment Roll <br />adopted. Liens against the property will be recorded as security for the amount of the assessment. <br />Assessments may be paid without interest at any tune before the expiration of thirty (30j days from <br />the date that notice of confirmation of the Final Assessment Roll is published_ If the assessments <br />are not paid within this time, all installments shall bear interest at a rate set by the OWASA Board <br />of Directors in the assessment proceedings until paid. hi the event one or more payments of the <br />assessment against a parcel of property are not made in~ accordance with the teems for such <br />payment, OWASA will take action under the lien to collect the money due. <br />For assessment projects, the property owner corinecting within sixty (60) days of the confirmation <br />
The URL can be used to link to this page
Your browser does not support the video tag.