Orange County NC Website
DocuSign Envelope ID:826509CF-ED5F-4F89-AE19-18F10AF97036 'El <br /> l <br /> 1 1 ''' 1 SH, 97_,:iii'li"j 1 CONTENTS <br /> 3.3.12 Relevant Project Experience of the Designer <br /> _ ' <br /> —_M1 <br /> - / i a4:.rli IN <br /> 1 �:. <br /> '"4,4` � - 'L �j rir. <br /> =i -- <br /> ICI [ } — y, .. ,i • y <br /> � f Ii <br /> ECU LYbil ! ( nT ��e 'c <br /> 1 <br /> . � <br /> +a <br /> Project Location ; <br /> Greenville, NC <br /> PROJECT DESCRIPTION Project Owner [' <br /> l <br /> The ECU Olympic Sports Complex was a three-phase project. Phase I East Carolina University <br /> consisted of a new Women's Softball Facility, including a 1,000-seat <br /> Project Contact <br /> stadium and a roofed practice batting and pitching facility. Phase II JJ McLamb,Associate Athletic Director <br /> included a 1,000-seat Soccer Stadium, a new NCAA-approved Varsity Internal Operations l <br /> mclambj@ecu.edu 252.737.4669 ' <br /> Track and Field Complex and a new Athletic Maintenance Facility. � � [� � <br /> 000 sq. ft. Team Building Architect: <br /> Phase III completed the project with a 20, q. g <br /> to support all Olympic athletic teams. Corley Redfoot Architects was Corley Redfoot Architects I <br /> Andy C I AIA <br /> the Architect-of-Record and LHC provided the structural engineering, andyc Cruickshank uick yredfootarchitects.com 1. <br /> while T.A. Loving Company served as the Construction Manager. 919.942.8586 <br /> Construction Period <br /> QUALITY STANDARDS May 2008—December 2013 <br /> Quality Assurance is part of our Standard Operations Procedures. Delivery Method <br /> CMAR <br /> Services Performed: <br /> Architect of Record <br /> GMP <br /> $33,800,00 <br /> Final <br /> $33,800,000 1 <br /> 11 i P <br />