DocuSign Envelope ID:826509CF-ED5F-4F89-AE19-18F10AF97036
<br /> ...4.,-.'1.,,,,,,,'''''9,:ge'll'j:
<br /> ■
<br /> 3.3.12 Relevant Project Experience of the Designer
<br /> 72i a
<br /> `I`iy',' �� � �°
<br /> r Irk' q�' +v�'
<br /> 10.-44� . Ai u a sa�eii4ir, l
<br /> �t r € 3
<br /> r�,. ,"",1111191 a _i . ,
<br /> ,;..r� '' i,., �R qua t ors,,,,,ss1- $a to w` .L _
<br /> ,€ -.tgg ills
<br /> /..e +&)*.w., i t. 1 i-- i/n_....,- f a i.RA ..fly&
<br /> �1 4 ,, +ra..a� I ,
<br /> _ r�s --- P
<br /> 1^
<br /> ,,. fi ar, n= P'
<br /> PRACTICE ILITY 1
<br /> Project Location
<br /> r ', , � , '7 - u � Raleigh NC{
<br /> Project owner
<br /> PROJECT DESCRIPTION �.
<br /> North Carolina State University
<br /> Corley Redfoot Architects was selected to design the new 92,000
<br /> Project Contact
<br /> sq. ft. Close-King Indoor Practice Facility for North Carolina State v. Cameron Smith
<br /> University. The state-of-the-art facility, constructed adjacent to Director Capital Project Management
<br /> Carter-Finley Stadium, will serve football, track and field, and other 919.513.0930
<br /> field sports. Architect
<br /> HOK I
<br /> Amenities include: full 120-yard football field with roof height for Andy v Cruickshank I AtlArchitects
<br /> kicking games and suspended goal posts; additional training and andyc @corleyredfootarchitects.com
<br /> conditions space beyond both end zones; four full-length sprint 919.474.2500
<br /> lanes in-ground and above g round p ads for lon g jump, triple jump Construction Period;
<br /> and other track events; end zone and 50-yardline viewing platforms June 2014—June 2015
<br /> for filming and observation; clerestory windows and glass roll-up **includes extended weather days**
<br /> doors to allow natural daylight; a complete sound system, and Delivery Method
<br /> support areas for equipment, strength and conditioning an sports Design-Build
<br /> t
<br /> medicine. The facility is seeking LEED NC-Silver Certification. Services Performed:
<br /> Architect of Record
<br /> QUALITY STANDARDS original
<br /> $14,200,000
<br /> Quality Assurance is part of our Standard Operations Procedures. Final
<br /> $14,200,000
<br /> 10
<br /> t
<br /> 1
<br />
|