Browse
Search
Agenda - 04-12-2007-2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 04-12-2007
>
Agenda - 04-12-2007-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:48:15 PM
Creation date
8/28/2008 11:35:37 AM
Metadata
Fields
Template:
BOCC
Date
4/12/2007
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 20070412
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. _ <br />~. <br />~ ,;~ ic7~,z~; Ea~~:° ~i~Vw{a-~@a\tl.~.,,~r~v~ ~~-y'.4"„~€~t~~, ~ '~;i9S9°~~~~1~~ J' <br />-~ <br />~~pp~``'C•abci,~3 5 <br />E~~N~PYfI~ 1_Y~l,~f~•1 ~~N <br />(Present tiVorth} <br />Energy Sates tt Avoided Costs $7,79~,b18 <br />Energy Production Costs $7,788,85$ <br />Net Energy Vatue $10,760 <br />Based upon this prelin~tinary analysis, the Carolina Nortll alternative has. the prospective <br />to be economically advantageous to both the University and the CoutYty f~t•om a cost <br />recovery standpoint (i.e., the total energy sales and avoided costs exceed the estimated <br />energy production costs.) Additional environmental bene:lts also accrue troth the green <br />power aspect of this alternative. <br />Because: of the natural tinge dependent decline in LFG generation :rates, the actual <br />development schedule of the Carolina North project is critical in terms of maximizing the <br />available LFG use potential of the Comity's existing landfill facilities. The economics of <br />the .project are driven vy maximizing cogeneration energy production and usage. any <br />delay in the Carolina North development tin~teline beyond the year 2808 could adversely <br />affect the economic feasibility of this option. <br />C~N~LUSIUNS <br />Eubanks l~aad Ca~eneratian Project <br />Based upon the estimated energy demands of potential users, the 1/ubatiks Road project is <br />neat econonuc;ally advantageous to the County at this time (i.e., the estimated costs of <br />producing energy from landfill gas are projected to exceed total energy sales and avoided <br />CUSt5~. <br />Garalina North Protect <br />Based iipot~t evaluations conducted to date, the Carolina North alternative has the <br />potential to be economically advantageous to both the University and Che County. <br />T17e l0-year average energy cost for collection, clean-up, and transmission of landfill gas <br />to the Carolina North campus are presented in the follo~r~ing table: <br />f)ranac ~.nunty, 1\orih ~'arc~linci G L,I"C.; Status l~xecutiv4 Sunnuar~~ <br />~~ • April2Ot)7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.