Browse
Search
Agenda - 04-12-2007-2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 04-12-2007
>
Agenda - 04-12-2007-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:48:15 PM
Creation date
8/28/2008 11:35:37 AM
Metadata
Fields
Template:
BOCC
Date
4/12/2007
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 20070412
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ . , , _.. <br />y <br />I-v:a_i"~~B~R~;~ IG. (~~e(C(~~~Y~ j 1 ?~i.~"`Cd~EI~E~~~4 ~_~61;!+I~;n~~~~~'~ <br />'~ able zt <br />ENERGY StJIVt~r1~RY <br />r, -''a~ ~-n iE"ik t d t~ {•:.i tr I J~"t 1 1 1 F '~.: <br />Available Energy <br />lFG - 30 Year Average 20,200 b9,000 <br />LFG - 30 Year Minimum 10,300 35,200 <br />Natural Gas Matte•Up - 30 Year Maximum 11,200 38,300 <br />Cambined Heating and Power <br />LFG Required 21,500 73,500 <br />Electric Energy Generation 6,400 21,800 <br />Waste Heat Recovery 9,600 32,800 <br />Under the proposed Carolina North alternative, landfill gas tivould be collected from both <br />the Nortli Eubanks Road and South Eubanks .Road MSWI.F units. The gas would be <br />compressed and pumped to the proposed Carolina -North site and used as the primary fuel <br />source for direct Erring of ~ 7~0 kW micTaturbule system with integrated exhaust .heat <br />recovery. The electricity generated by the nlicraturbine would be used far cooling, <br />power,. end ..lighting of proposed North campus buildings. Thermal energy fram the waste <br />heat recovery cycle would be used far heating and passible coaling and/or dehumidifica- <br />tion purposes. Excess power (electricity) during the initial. years of operation (2009 <br />through 2011 time frame) would be sold to Duke Energy under a parallel getiexation <br />agreement. <br />Major components al' the system include: gas extraction wells and collection systeizi <br />(North Eubanks MSWI..F' and South Eubanks MSWLF), blower and flare stations (North <br />Eubanks IvISWLF and South Eubanks MSWLF), moisture removal and ,gas compression <br />station {Eubanks Road Salicl Waste 1vlanagement Facilities site), bas transmission line to <br />Carolina North complex, fuel conditioning and microtttrbine system (Carolrna North <br />complex) anti power grid ntertic and relay stivitch gear (Carolina North. complex). <br />"I`11e results of a 30-year, present wa>•tl1 analysis far this alternative are stunn~arizcd in <br />Table 5. <br />Change Count}~. \orth C'aralina 5 L.I'C:i Status I~xccuti~•e Summar}~ <br />:1 pri 12t)t)7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.