Browse
Search
2016-592-E AMS - Warren-Hay Mechanical Contractors, Inc. - clean, treat HVAC system at ES
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-592-E AMS - Warren-Hay Mechanical Contractors, Inc. - clean, treat HVAC system at ES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 4:27:35 PM
Creation date
10/31/2016 3:49:33 PM
Metadata
Fields
Template:
Contract
Date
10/11/2016
Contract Starting Date
10/11/2016
Contract Ending Date
12/31/2016
Contract Document Type
Agreement - Construction
Amount
$17,325.00
Document Relationships
R 2016-592-E AMS - Warren-Hay Mechanical Contractors, Inc. - clean, treat HVAC system at ES
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: C41A43F4-7F0E-4678-B143-E34641EC9603 <br /> WARREN P <br /> Mechanical Contractors Inc. <br /> Hating and Ad Conditioning <br /> P.O. Box 818 g Hillsborough, NC 27278 <br /> 919-732-4362 <br /> September 28,2016 <br /> Orange County Public Works <br /> Re: Orange county EMS facility <br /> PROPOSAL <br /> We hereby submit specifications and estimates for: As noted: <br /> e Provide labor and material required to repair(noted refrigerant leak)on upstairs system. <br /> Will require system evacuation,repair and weigh in refrigerant charge after evacuation <br /> and vacuum. <br /> We p p hereby ro hereb to furnish material and labor: $3,750.00 <br /> Payment to be made as job progresses. <br /> Acceptance: <br /> Date: <br /> Exclusions/Clarifications: <br /> e System will be down during repair&evacuation. Anticipate system being off line <br /> for 2 business days. <br /> • Temporary units by others. <br /> Respectfully submitted by:Ron LaPann Commercial Division ron.fapann(c° warren-hay.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.