Browse
Search
2016-576-E AMS - ASD (Asphalt Services On Demand) for repaving parking lot at Skills Development
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-576-E AMS - ASD (Asphalt Services On Demand) for repaving parking lot at Skills Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 3:56:50 PM
Creation date
10/25/2016 11:28:55 AM
Metadata
Fields
Template:
Contract
Date
10/20/2016
Contract Starting Date
10/20/2016
Contract Ending Date
12/31/2016
Contract Document Type
Agreement - Construction
Amount
$100,702.50
Document Relationships
2017-024-E AMS - ASD-Asphalt Services On Demand - CO to 2016-576-E for repaving parking lot at Skills Developmen
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2016-576-E AMS - ASD (Asphalt Services On Demand) for repaving parking lot at Skills Development
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:6EED282B-AE99-4E23-8F12-8D5CFC79F06D <br /> [Departmental Use Only] <br /> TITLE Skills Dev Parking Lot <br /> FY 2016-17 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 20th <br /> day of October, 2016, by and between ASD (Asphalt Services On Demand), (hereinafter called the <br /> "Contractor"), and Orange County, a body politic and a political subdivision of the State of North <br /> Carolina, (hereinafter called the "Owner"). <br /> WITNES SETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by CRA(Sheet C1.0, C1.1,C2.0, C3.0 dated 6/21/16) <br /> b. Written specifications prepared by the project engineer. <br /> c. ASD proposal dated October 5, 2016 which fully describes the work to be performed. <br /> Such work will hereafter be called the "Work". <br /> d. Related documents listed under Section 1 above. <br /> 3. TERM AND SCHEDULING <br /> Revised 6/16 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.