Browse
Search
2016-573-E AMS - Durham Electric Company, Inc. to install power for cafe
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-573-E AMS - Durham Electric Company, Inc. to install power for cafe
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 9:47:32 AM
Creation date
10/24/2016 3:40:59 PM
Metadata
Fields
Template:
BOCC
Date
10/24/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$24,119.00
Document Relationships
R 2016-573-E AMS - Durham Electric Company, Inc. to install power for cafe
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 1DFCB082-2DBE-4FF6-A29E-A75A452063D6 <br /> Durham Electric Company, Inc. <br /> 807 North Mangum Street•••Durham,NC 27701 <br /> Office 919-682-5771®®4Fax 919-682-5772 <br /> Est Durham <br /> if Electric Company <br /> PROPOSAL <br /> Date:July 28,2016 <br /> Attn:Angel Barnes <br /> Capital Projects Manager <br /> Orange County Asset Management Services <br /> 131 West Margaret Lane <br /> Hillsborough,N.C.27278 <br /> Direct 919-245-2628 Mobile 919-610-8182 <br /> gar ne @ cfanggc ourgoog.go,/ <br /> Thank you very much for allowing Durham Electric Company to offer this proposal for the Electrical Work at <br /> The Orange County Department of Social Services building at 113 Mayo Street,Hillsborough,NC. <br /> This proposal includes the work as described in the"Scope of Work"section below. <br /> SCOPE of Work: <br /> Durham Electric Company's proposal includes furnishing all materials,labor,inspections and equipment <br /> required to install the following electrical system. <br /> 1) 225 amp,208/120V 3 phase panel with a 100 amp 3 phase breaker to feed the new 100 amp panel in utility room close to <br /> the kitchen area.This panel will have 39 spare spaces for future use. <br /> 2) 225-amp feeder conduit and wiring fed from an existing 225-amp breaker in an existing panel in the back of the building. <br /> This will feed the new 225-amp panel. <br /> 3) 100 amp 208/120V 3 phase panel to be installed in the utility room close to the kitchen area.All required breakers needed <br /> to feed new outlets are included in this panel,with several spare breaker spaces for future use. <br /> 4) 100-amp feeder conduit and wiring from new 225-amp panel to feed new 100-amp panel. <br /> 5) The following electrical outlets will be installed in the kitchen area or as noted.They will be installed using THHN wiring, <br /> EMT conduit and flexible metal conduit where required to fish down walls.All wiring and conduits will meet or exceed all <br /> NEC requirements. <br /> a) L6-30R twist lock receptacle for Cappuccino machine. <br /> b) (2)20 amp duplex receptacles for coffee grinder and machine.Each duplex to be a dedicated circuit. <br /> c) (2)Duplex receptacles over trash receptacle cabinet for microwave ovens. <br /> d) (2)Duplex receptacles over trash receptacle cabinet for toaster ovens <br /> e) (2)Receptacles for TV's.One over trash receptacle cabinet and one in cafe area. <br /> f) (1)Duplex receptacle at front entrance for receptionist desk <br /> All materials,devices,panels,wiring,conduits and other miscellaneous items are UL listed,heavy duty commercial grade.The <br /> installation and workmanship will meet or exceed NEC requirements. <br /> Total Quote for the work as described above Is:$22,921.00 <br /> An alternate/add to install a 3 way switching system for the light fixtures with one switch by front door and a second switch <br /> located in the back is existing and will be modified so lights can be turned on/off from either location: <br /> Total for Switching alternate:$1,198.00 <br /> Please contact me with any questions. <br /> Thank you for the opportunity, <br /> Bill Parks <br /> Vice President of Operations <br /> Durham Electric Company Inc. <br /> 807 N.Mangum St. <br /> Durham,NC 27701 <br /> Office 919-682-5771 Fax 919-682-5772 Mobile 919-698-6946 bill.parks @durhamelectriccompany.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.