Browse
Search
Agenda - 07-05-1988
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1988
>
Agenda - 07-05-1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 4:11:20 PM
Creation date
10/21/2016 3:58:39 PM
Metadata
Fields
Template:
BOCC
Date
7/5/1988
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESEVOIR MAPPING 014 <br /> PAGE 2 <br /> are incorporated by reference and are considered <br /> part of this document. (Designated as Task 1. ) <br /> 2. All necessary aerial photography required for the <br /> preparation of 1"=100, scale topographic maps with <br /> TWO-FOOT CONTOURS of the POTENTIAL CONSTRUCTION <br /> AREA, delineated on -enclosures A and C. <br /> (Designated as Task 2. ) <br /> • <br /> 3. All field surveying work necessary for the <br /> preparation of the topographic maps described in <br /> tasks 1 and 2 above, to include the erection of <br /> monuments, two on each bank in the vicinity of the <br /> potential dam site indicated on Enclosure A. <br /> (Designated as Task 3. ) <br /> 4. Preparation of 1" =2000 scale topographic maps with <br /> FIVE-FOOT CONTOURS for the entire RESERVOIR STUDY <br /> AREA. (Designated as Task 4. ) <br /> 5. Preparation of 1"=104' scale topographic maps with <br /> TWO-FOOT CONTOURS for the POTENTIAL CONSTRUCTION <br /> AREA. (Designated as Task 5. ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.