Orange County NC Website
RESEVOIR MAPPING 014 <br /> PAGE 2 <br /> are incorporated by reference and are considered <br /> part of this document. (Designated as Task 1. ) <br /> 2. All necessary aerial photography required for the <br /> preparation of 1"=100, scale topographic maps with <br /> TWO-FOOT CONTOURS of the POTENTIAL CONSTRUCTION <br /> AREA, delineated on -enclosures A and C. <br /> (Designated as Task 2. ) <br /> • <br /> 3. All field surveying work necessary for the <br /> preparation of the topographic maps described in <br /> tasks 1 and 2 above, to include the erection of <br /> monuments, two on each bank in the vicinity of the <br /> potential dam site indicated on Enclosure A. <br /> (Designated as Task 3. ) <br /> 4. Preparation of 1" =2000 scale topographic maps with <br /> FIVE-FOOT CONTOURS for the entire RESERVOIR STUDY <br /> AREA. (Designated as Task 4. ) <br /> 5. Preparation of 1"=104' scale topographic maps with <br /> TWO-FOOT CONTOURS for the POTENTIAL CONSTRUCTION <br /> AREA. (Designated as Task 5. ) <br />