Orange County NC Website
1 . -- • <br /> 096 <br /> (ii) Location of all homes, industrial buildings, public <br /> or private utilities, roads, wells, watercourses, and <br /> other applicable details regarding the general <br /> topography; <br /> (iii) If site is in 100-year floodplain, provide map <br /> showin relationship (Federal Insurance Agency map, <br /> if available) ; <br /> (b) An approval letter from the unit of local government <br /> having zoning authority over the area where the site is to <br /> be located; <br /> (c) Location of site on a county roadmap; <br /> (d) The types of waste for disposal;. and <br /> (e) Any other information pertinent to the suitability of the <br /> proposed site; <br /> (2) The following is required for reviewing a construction plan <br /> application for a proposed demolition landfill: <br /> (a) A plot plan of the proposed site showing the property <br /> boundary, proposed landfilling limits, access controls and <br /> features such as roads, streams, etc. ; <br /> (b) Provisions for controlling erosion; <br /> (c) Procedures for promoting vegetative growth as soon as <br /> • <br /> possible on all completed areas (seeding and fertilizer <br /> specifications) ; <br /> • (d) A copy of the deed or other legal description of the site <br /> that would be sufficient as a description in an instrument <br /> of conveyance and property owner' s name; <br /> (e) Anticipated type of material to be disposed of at the site <br /> (f) Name and phone number of individual responsible for <br /> operation and maintenance of the site; <br /> (g) Projected use of land after completion of the fill; and <br /> (h) Any other information pertinent to the proposed <br /> operational plan: <br /> • <br /> History Note: Statutory Authority G.S. 130A-294; <br /> Eff.. April 1, 1982. <br /> . 0507 OPERATIONAL REQUIREMENTS FOR DEMOLITION LANDFILLS <br /> Any person who maintains or operates a demolition landfill site <br /> shall maintain and operate the site in conformance with the <br /> following practices, unless otherwise specified in the permit: <br /> (1) Operational plans shall be approved and followed as specifie <br /> for the site; <br /> (2) A site shall only accept those solid wastes which it is <br /> permitted to receive; <br /> (3) Solid waste shall be restricted to the smallest area feasibl <br /> • and compacted as densely as practical into cells; <br /> (4) Solid waste shall be covered as specified by the division ir. <br /> the permit; <br /> • • • <br /> - - <br /> ' j1 • • - <br /> '41 <br /> .41 <br /> (12) <br />