Orange County NC Website
, . <br /> , <br /> 4.: 206 ' . . <br /> 17 i <br /> ' . . <br /> request for a six-month extension to January Gr <br /> 1989 . <br /> Best asked if the request for extension could be <br /> utied-in". with the request to the Commissioners for <br /> a study on alternate systems. Collins responded <br /> . <br /> that he did not believe this was an option for the <br /> Board. The Special. Use Permit has already been <br /> issued and the only request to be considered is <br /> • <br /> that of a six-month extension of the Special Use <br /> • Permit. Collins stated that the Ordinance does not <br /> address issues regarding alternative systems as <br /> criteria to be considered in order to grant the <br /> extension. <br /> • Jacobs stated that this decisidn did not have to be <br /> • <br /> made before July 6. 1988. The study on alternative <br /> systems could be completed prior to that date and <br /> • time would remain in which to refer Flowers Mobile <br /> • <br /> Some Park Special Use Permit back to public hearing <br /> . . <br /> . . if necessary. Collins recommended that this item • <br /> • • • be referred to the County Attorney for legal <br /> . <br /> implications since . this Special Use Permit was <br /> . . <br /> • <br /> issued eight months ago. . . <br /> - • . <br /> . . <br /> . • <br /> . . . <br /> • <br /> • <br /> . <br /> . <br /> - <br /> • <br /> • • c. Capacity Use Public Bearing • <br /> • . . <br /> Jacobs asked if minutes were to be available from <br /> ' the public hearing. Collins responded he would <br /> request them from the Division of Water Resources. <br /> Best asked when the Board had to make a statement <br /> - • regarding the capacity use designation. Collins <br /> responded that March 3 is the deadline for written <br /> comments to the Division of Water Resources. <br /> MOTION: Best moved that a statement be prepared to . accept • . <br /> the capacity use designation with assurance from <br /> . the State that they will work with the local <br /> governments . and in a designated time frame to <br /> develob regional cooperation and a management plan <br /> • that would eventually lift the capacity use <br /> • designation. Seconded by Pilkey. <br /> • <br /> • . <br /> • PileyLamorted-on the capacIty use public-ire-axing <br /> noting that of the forty-five people speaking at <br /> the February 3 public hearing, only five were <br /> against the capacity use designation and two <br /> remained unsure. Almost everyone spoke to the <br /> • <br /> . . <br /> • concern of water management. She noted that an <br /> elected official from the Town of Smithfield <br /> thanked State representatives for the Capacity Use <br /> . Searing and urged the designationfor 'the benefit <br /> of those users downstream. Pilkey continued that <br /> most of the people speaking were landowners along <br /> the river all the way . to Smithfield and they <br /> , expressed the desire for a capacity use designation <br /> • <br />