Browse
Search
Minutes 09-12-2016
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2016
>
Minutes 09-12-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 8:26:39 AM
Creation date
10/19/2016 8:00:16 AM
Metadata
Fields
Template:
BOCC
Date
9/12/2016
Meeting Type
Public Hearing
Document Type
Minutes
Document Relationships
Agenda - 09-12-2016 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
Agenda - 09-12-2016 - C.1 - Class A Special Use Permit - Solar Array off US Highway 70 in Cheeks Township
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
Agenda - 09-12-2016 - D.1 - Town of Hillsborough/Orange County Central Orange Coordinated Area Land Use Plan Map Amendment
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
Agenda - 09-12-2016 - D.2 - Unified Development Ordinance (UDO) Text Amendments – Hillsborough Economic Development District
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
Agenda - 09-12-2016 - D.3 - Zoning Atlas Amendment – Hillsborough Economic Development District
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
Agenda - 09-12-2016 - D.4 - Unified Development Ordinance Text Amendment – Modify Use Standards
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
ORD-2016-031 Ordinance Amending UDO to modify use standards , etc., in Office/Research and Manufacturing zoning district
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2016
RES-2016-056 Resolution Amending the Town of Hillsborough/OC Central Orange Coordinated Area Land Use Plan
(Message)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> (C) Standards for Solar Array— Public Utility (Class A Special Use Permit) <br /> (1) Submittal Requirements <br /> In addition to the information required by Section 2.7, the following shall be <br /> submitted as part of the application: <br /> (a) A site plan showing all existing structures on the property, any proposed <br /> buildings or structures that are necessary to support the proposed array, <br /> existing and proposed storage areas, parking and access areas, <br /> topography at a contour interval of five feet, any officially designated <br /> floodplains or alluvial soils. <br /> (b) Plans and elevations for all proposed structures and arrays as well as <br /> descriptions of the color and nature of all exterior materials. <br /> (c) Landscape Plan, at the same scale as the site plan, showing existing <br /> and proposed trees, shrubs, ground cover and other landscape material <br /> (d) A soils report denoting the types of soil on the property including detail <br /> on the compaction necessary to support the proposed development. <br /> (2) Standards of Evaluation <br /> (a) All on-site utility and transmission lines shall, to the extent feasible, be <br /> placed underground. <br /> (b) The height of proposed arrays and support structures shall not exceed <br /> 40 feet. <br /> (c) Individual arrays/solar panels shall be designed and located in order to <br /> prevent reflective glare toward any inhabited buildings on adjacent <br /> properties as well as adjacent street rights-of-way. <br /> (d) A clearly visible warning sign concerning voltage must be placed at the <br /> base of all pad-mounted transformers and substations. <br /> (e) All mechanical equipment of principal solar energy systems including any <br /> structure for batteries or storage cells, shall be completely enclosed by a <br /> minimum eight (8)foot high fence with a self-locking gate, and provided <br /> with screening in accordance with the provisions of Section 6.8. <br /> Specific Standards <br /> ➢ Specific Standards for Special Use Permits (UDO § 5.3.2(B)) <br /> • (1) Method and adequacy of provision of sewage disposal facilities, solid waste, <br /> and water <br /> o There will be no on-site personnel, so the Facility will not require sewage <br /> disposal facilities, solid waste, or water services <br /> • (2) Method and adequacy of police, fire and rescue squad protection <br /> o Orange County Emergency Service staff and Sheriff's office have <br /> indicated the project can be served <br /> • (3) Method and adequacy of vehicular access to the site and traffic conditions <br /> around the site <br /> o Facility will be accessed by a driveway constructed to NCDOT standards <br /> o Traffic study found site would be accessed by less than one car per day <br /> during operation <br /> • (4) Other use specific standards as set forth herein <br />
The URL can be used to link to this page
Your browser does not support the video tag.