Browse
Search
Minutes 09-12-2016
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2016
>
Minutes 09-12-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 8:26:39 AM
Creation date
10/19/2016 8:00:16 AM
Metadata
Fields
Template:
BOCC
Date
9/12/2016
Meeting Type
Public Hearing
Document Type
Minutes
Document Relationships
Agenda - 09-12-2016 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
Agenda - 09-12-2016 - C.1 - Class A Special Use Permit - Solar Array off US Highway 70 in Cheeks Township
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
Agenda - 09-12-2016 - D.1 - Town of Hillsborough/Orange County Central Orange Coordinated Area Land Use Plan Map Amendment
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
Agenda - 09-12-2016 - D.2 - Unified Development Ordinance (UDO) Text Amendments – Hillsborough Economic Development District
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
Agenda - 09-12-2016 - D.3 - Zoning Atlas Amendment – Hillsborough Economic Development District
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
Agenda - 09-12-2016 - D.4 - Unified Development Ordinance Text Amendment – Modify Use Standards
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 09-12-2016 - Quarterly Public Hearing
ORD-2016-031 Ordinance Amending UDO to modify use standards , etc., in Office/Research and Manufacturing zoning district
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2016
RES-2016-056 Resolution Amending the Town of Hillsborough/OC Central Orange Coordinated Area Land Use Plan
(Message)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> o May through September more activity to maintain landscaping <br /> Chair McKee: Now you say twice a year for scheduled maintenance—and you mentioned a <br /> little earlier about the "mowing". Scheduled maintnenace is not including the mowing, I'm <br /> assuming. <br /> Brian Quinlan: Correct. <br /> Chair McKee: Ok. <br /> Brian Quinlan: There will probably be different groups that we hire to do that. More technical <br /> guys to go in and actually make sure the system is working, and then more landscapers to <br /> actually do the landscaping. <br /> ➢ Solar facilities have no significant impact on the permeability of the land and do not <br /> require permanent storm water management <br /> • Panels are supported on direct driven piles— no cement pilings <br /> • Land is not paved and any civil site work is minimized <br /> ➢ Low intensity development of solar facility with minimal impact on land <br /> maintains/preserves the existing surrounding wetlands and significant amount of <br /> woodland <br /> ➢ Wetlands have been delineated by environmental engineers and confirmed by USACE <br /> • Wetlands are delineated on surveys and construction drawings <br /> • Project construction and operation has no impact on wetlands <br /> • Buffer maintained between project and wetlands <br /> ➢ Site designated 10-year transition area in County land use plan <br /> • Transition from rural/low density to higher density uses <br /> • Solar project consistent with plan <br /> o Beneficial use of site with limited/no capacity for higher density uses <br /> o Provides tax base to support transition with no impact on infrastructure <br /> o Location of project and design are compatible with low and high density <br /> • Not visible <br /> • No noise <br /> • No traffic <br /> ➢ County plan emphasizes sustainable growth balancing social, economic and <br /> environmental factors <br /> • Solar project supports all factors <br /> ➢ County land use plan encourages locally generated alternative energy resources and <br /> promotes alternative and sustainable fuels <br /> ➢ Landscaping requirements and location of project will make it not visible from nearest <br /> residence and street <br /> • Prevents glare from the project <br /> ➢ Decommissioning plan submitted to County to remove all equipment and restore <br /> property <br /> Chair McKee: May I ask a question — I hate to keep interrupting —on the decommissioning. Is <br /> decommissioning after 25— after the lease term —a given, or is there an option for refurbishing, <br /> and a continuance? <br />
The URL can be used to link to this page
Your browser does not support the video tag.