Browse
Search
Agenda - 07-06-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 07-06-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2016 11:10:03 AM
Creation date
10/18/2016 10:54:30 AM
Metadata
Fields
Template:
BOCC
Date
7/6/1987
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7P c7 <br /> .:� 1 .1 LIU U <br /> 29 <br /> Road and Little River Church Road. The road classifications have <br /> been shown because they serve as a guide in determining the <br /> location of Activity Nodes and Rural Residential Areas. <br /> Little River Township lies in two water supply watersheds. The <br /> northern part of the Township lies in the Flat River Watershed <br /> which flows to Lake Michie, the primary water supply for the City <br /> of Durham. <br /> The southern 80% of the Township lies in the Little River <br /> drainage basin which flows into the Little River Reservoir in <br /> Durham County. Bell indicated that Mr. Tom Bruce of the Water <br /> Resources Department for the City of Durham was available to <br /> address this item in more detail later in the meeting. <br /> Activity Nodes are the same as 1981 except for Harris Crossroads. <br /> A project that has generated a great deal of discussion and <br /> concern is Treyburn in north central Durham County. It is a 5200 <br /> acre mixed-use development. Over the next 20 - 25 years, a range <br /> of 20, 000 to 40, 000 jobs in Treyburn has been estimated. <br /> Approximately 4000 dwelling units are also proposed as part of <br /> Treyburn. <br /> The only use currently under construction at Treyburn is the <br /> Organon Teknika Plant to be fully operational by early 1988 . It <br /> will initially employ 400 - 500 people and by 1998 should have <br /> around 2000 employees. <br /> Construction is just beginning on the first 60 residential units <br /> which are on 80, 000 square foot lots with public water and sewer. <br /> Durham Research Properties estimates that ten years from now all <br /> residential development at Treyburn will be completed and there <br /> will be. 10, 000 - 15, 000 jobs. <br /> Further development at Treyburn is contingent upon upgrading the <br /> Eno Waste Treatment Plant. The current capacity is 2 . 5 MGD. If <br /> all improvements stay on schedule, a 10 MGD plant could be on <br /> line in 1991. The plant is currently the subject of an <br /> environmental impact statement, thus the 1991 date might not be <br /> correct. <br /> The best source for determining where residential demand <br /> generated by Treyburri will be strongest is the Traffic Impact <br /> Analysis prepared by Kimley-Horn & Associates of Raleigh. Their <br /> projections for traffic into and out of Treyburn are: north 20%, <br /> south 55%, east 10% and west 15%. <br /> The Planning Staff recommends approval of the amended text and <br /> map and incorporation into Section 3 .7 of the Land Use Plan. <br /> Following this hearing, the Little River TAC will meet to <br /> formulate a recommendation to the Planning Board. The Planning <br /> Board will meet on June 15 to consider TAC comments and formulate <br /> a recommendation to the Commissioners for their meeting on July <br /> 6, 1987. <br />
The URL can be used to link to this page
Your browser does not support the video tag.