Browse
Search
2016-560-E DEAPR - Clark Poe Construction, Inc. to move historic Hollow Rock Store
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-560-E DEAPR - Clark Poe Construction, Inc. to move historic Hollow Rock Store
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2016 10:49:14 AM
Creation date
10/11/2016 10:41:42 AM
Metadata
Fields
Template:
BOCC
Date
10/11/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$24,670.00
Document Relationships
R 2016-560-E DEAPR - Clark Poe Construction, Inc. to move historic Hollow Rock Store
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:453C1A54-9B45-4FE0-9E13-2B8723D592A7 <br /> NORTH CAROLINA CONSTRUCTION SERVICES <br /> AGREEMENT UNDER$50,000 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter "Agreement"), is made and entered <br /> into this 30th day of September, 2016 by and between Orange County, North Carolina <br /> (hereinafter the "Owner") party of the first part; and Clark Poe Construction, Inc. (hereinafter the <br /> "Contractor"),party of the second part; <br /> WITNESSETH: <br /> For the purpose and subject to the terms and conditions hereinafter set forth, the Owner <br /> hereby contracts for the construction services of the Contractor, and the Contractor agrees to <br /> provide the construction services to the Owner in accordance with the terms of this Agreement. <br /> I. TERM AND MAXIMUM AMOUNT PAYABLE <br /> Beginning and ending dates of contract: October 1, 2016 through April 30, 2017. The <br /> Project Commencement Date shall be October 1, 2016. Dollar Amount Not to Exceed: Twenty <br /> Four Thousand Six Hundred Seventy Dollars ($24,670.00) <br /> 2. SERVICES <br /> Contractor agrees to provide the following construction services (the "Work"): Moving the <br /> historic Hollow Rock Store to the Hollow Rock Nature Park. Work includes: installation of new <br /> footings and foundation walls; termite treatment for footings; foundation drainage; moving <br /> structure from existing site to new site; structural repairs to existing floor framing system <br /> including new central girder beam and crawl space access door as per engineering drawings; <br /> installation of new concrete slab for front porch; installing cedar tree trunk support posts for front <br /> porch(posts provided by County); and grading and seeding around building. <br /> Contractor shall not sub-contract all or any part of the construction services provided for in <br /> this Agreement without prior written approval of the Owner. Contractor shall be responsible for <br /> all errors or omissions, in the performance of the Agreement. Contractor shall correct any and all <br /> errors, omissions, discrepancies, ambiguities, mistakes or conflicts at no additional cost to <br /> Owner. <br /> 3. PAYMENT <br /> Contractor shall submit an invoice for construction services provided. The invoice shall <br /> contain Contractor's name and federal tax identification number and shall be signed and dated by <br /> an officer of Contractor. It shall detail all construction services provided in payment requests. <br /> The Owner will make payments to Contractor within thirty (30) days after receipt of and <br /> approval of the invoice by the contracting department. <br /> In the event the amount stated on an invoice is disputed by Owner, then Owner may <br /> withhold payment of all or a portion of the amount stated on an invoice until the parties resolve <br /> the dispute. In addition, should Contractor fail to perform its duties under the terms of this <br /> Agreement, Owner may, without fault or penalty, withhold any payment associated with the <br /> Work to be performed until such time as said work is completed. <br /> Revised 6/16 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.