Browse
Search
Agenda - 11-01-94-X-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 11-01-94 Regular Mtg.
>
Agenda - 11-01-94-X-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2016 10:36:11 AM
Creation date
10/7/2016 10:34:56 AM
Metadata
Fields
Template:
BOCC
Date
11/1/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
X-A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> b) Tower antennas would be allowed on the ground or on roof-tops, with a <br /> height limit of 15 feet. Higher towers would require approval of a Special <br /> Use Permit. <br /> Revisions to Section 3.4(Service and Storage) and 3.1(Architectural Design)have <br /> been prepared to address this recommendation. (Attachments 5 and 6) <br /> 6. Use a different means of identifying high water use. The Design Manual <br /> currently requires approval of a Special Use Permit or Planned Development if <br /> water use exceeds an industry average. The Work Group recommended that a <br /> specific number, in terms of gallons per day, be used to define the limit above <br /> which approval by the Board of Commissioners would be required. <br /> The Town and County staffs recommend a threshold of 30,000 gallons per day, <br /> which is approximately 1% of the daily capacity of the existing Hillsborough <br /> wastewater treatment plant. Flynt Industries,which uses approximately 500,000 <br /> gallons per day,is the only existing industry served by Hillsborough which exceeds <br /> the proposed threshold. <br /> A proposed revision to Section 2.4 (Environmental Factors) is included to <br /> implement this recommendation. (Attachment 7) <br /> B. Options to Address Issues on Which Consensus was not Reached <br /> The Work Group did not reach consensus on whether or not water and sewer service <br /> should be extended to serve the south side of I-40. The southernmost boundary of any <br /> sewer service from Hillsborough would be the ridgeline forming the boundary of the Cates <br /> Creek drainage basin. <br /> The Work Group identified the following options and possibilities: <br /> 1. T,imit public water and sewer service to the north side of I-40,delaying extensions <br /> to the area south of I-40 until as-yet unspecified development triggers are met. <br /> Development triggers discussed by the Work Group included specifying a <br /> percentage of area within the remainder of the EDD which must be developed or <br /> planned, or specifying a time period which must pass, after which the issue could <br /> be revisited. In the interim,allow alternative wastewater disposal systems on the <br /> south side of I-40. <br /> Discussion of the Work Group on this issue focused to a great extent on the <br /> perception held by some citizens that the extension of public services to the south <br /> side of I-40 would create development pressure at the intersection of I-40 and New <br /> Hope Church Road, which may result in extension of water and sewer service <br /> from OWASA through the Rural Buffer. <br /> Terms of the Joint Planning Agreement between Orange County, Chapel Hill and <br /> Carrboro, and the Orange County Water and Sewer Policy currently prohibit <br /> extensions into the Rural Buffer except as necessary to address a public health <br /> emergency or serve an essential public service, such as a school. Concern was <br /> expressed that future development pressure in or near the Rural Buffer could <br /> result in changes to the Agreement which could compromise the Rural Buffer. <br /> • <br /> 2. Limit public water and sewer service to the north side of I-40 for a two-year <br /> period during which county-wide issues such as those relating to open space,rural <br /> character, and farmland preservation are resolved. In two years, the issue of <br /> water and sewer south of I-40 would be reconsidered. In the interim, allow <br /> alternative wastewater disposal systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.