Orange County NC Website
24 <br /> ATTACHMENT 7 <br /> authorized by any water management plan and discharge <br /> permit in effect at the time of approval. <br /> In association with the installation of water and/or sewer lines, <br /> the location and size of easements for such facilities must be <br /> approved by and dedicated in the form of a deed of <br /> CONSTRUCTION STANDARDS easement to the utility provider. In addition,where cuts in <br /> existing streets are made for water and/or sewer work,all <br /> 1. All construction and equipment cutting, bauckfilling, and paving shall be done in accordance with <br /> yards must be fenced and located N.C. Department of Transportation and/or municipal <br /> so as to minimize their impact on <br /> adjacent properties and public • specifications and procedures. <br /> areas, <br /> 2. Construction sites must be Water Use limitations <br /> maintained in a neat and orderly Because of the size or remaining excess capacity of treatment <br /> manner.All trash must be kept in <br /> enclosed containers and emptied plants for some utility providers, uses which require large <br /> frequently, quantities of water for manufacturing and/or processing <br /> 3. Special care must be taken to operations will require the review and approval of the Board <br /> protect existing pavement from of County Commissioners as a Planned Development. <br /> damage and construction access <br /> Applicants for <br /> arranged so as to minimize pp approval of a comprehensive site <br /> adverse impacts on existing development plan must submit documented data for the <br /> businesses and residential areas, proposed use or a comparable facility which justifies the <br /> 4. Building materials and equipment projected water consumption rotes.If the projected water <br /> must not be stored in sensitive consumption rates exceed 30,000 gallons per day,the <br /> areas, and trees and other natural <br /> areas must be protected during applicant will be required to obtain approval through the <br /> construction, provisions of Article 7,Planned Developments,of the <br /> 5. All permanent utility lines must Orange County Zoning Ordinance. <br /> be installed underground. <br /> Construction & Maintenance <br /> The purpose of construction and maintenance criteria is to <br /> minimize the adverse impacts of construction related activities <br /> and to promote a uniform,neat, and clean appearance <br /> throughout the Economic Development Districts. For this <br /> reason,construction activities must be conducted in <br /> accordance with the standards shown on the accompanying <br /> table. <br /> Following the completion of construction, all owners and/or <br /> occupants of property must maintain all buildings and <br /> structures,access drives, parking lots,loading areas,and <br /> storage yards in good repair,and must keep such premises <br /> Economic Development Districts Desen Manual Pape 2.4.2 6 <br />