Browse
Search
Agenda - 03-29-2007-
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-29-2007
>
Agenda - 03-29-2007-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 9:11:58 AM
Creation date
8/28/2008 11:32:27 AM
Metadata
Fields
Template:
BOCC
Date
3/29/2007
Document Type
Agenda
Document Relationships
Minutes - 20070329
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY BOARD OF CONMUSSIONERS <br />A Resolution <br />In Support of an Emergency Petition to the US Nuclear Regulatory Commission by the NC Waste <br />Awareness and Reduction Network, the Union of Concerned Scientists, the Nuclear Information <br />and Research Service, NC Fair Share and Students United for a Responsible Global Environment <br />Seeking Regulatory Action by the Commission to Enforce Existing Fire Protection Standards and <br />Regulations Applicable to the Shearon Harris Nuclear Power Plant <br />WHEREAS, the Orange County Board of Commissioners has a long and well - established practice of <br />advocating for any and all activities that would promote the public health, safety and <br />welfare, particularly in regard to feasible threats to that health, safety and welfare; and <br />WHEREAS, approximately 50 percent of the risks of catastrophic nuclear plant failure are associated <br />with fire- related accidents, as calculated by the Nuclear Regulatory Commission; and <br />WHEREAS, the Orange County Board of Commissioners also have a long and well- established record <br />of concern regarding security and safety issues at the Shearon Harris nuclear power plant, <br />related to the potential magnitude and catastrophic consequences of a nuclear power plant <br />fire leading to an airborne release of nuclear waste materials; and <br />WHEREAS, information has recently been presented to the Board of County Commissioners as to <br />ongoing problems with fire safety and fire protection practices at the Shearon Harris <br />nuclear power plant; and <br />WHEREAS, Progress Energy /CP &L has indicated that it will apply to the NRC for permission to take <br />up to nine more years to bring the Shearon Harris nuclear power plant into compliance <br />with fire safety standards and regulations; and <br />WHEREAS, Progress Energy /CP &L has indicated that it will apply to the NRC for a twenty -year <br />extension of its operating license for the Shearon Harris plant while the plant is not in <br />compliance with existing fire safety standards and regulations; and <br />WHEREAS, Progress Energy /CP &L has indicated that it is in the process of evaluation of permitting, <br />designing and constructing two nuclear power reactors at the Shearon Harris nuclear <br />power plant while the existing plant is not in compliance with existing fire safety <br />standards and regulations; <br />NOW, THEREFORE, do we, the Orange County Board of Commissioners, hereby resolve to support <br />the petition of the NC Waste Awareness and Reduction Network, the Union of Concerned Scientists, the <br />Nuclear Information and Research Service, NC Fair Share and Students United for a Responsible Global <br />Environment to the US Nuclear Regulatory Commission asking that the NRC compel Progress <br />Energy /CP &L to immediately bring the Shearon Harris nuclear power plant into compliance with <br />existing federal fire safety standards and regulations applicable to nuclear power plants. <br />This is the 3rd day of October, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.