Orange County NC Website
C. Transportation travel to and from permanent <br /> All cost associated with transportation are for contractor tra <br /> facilities. $300.00/Trip <br /> A. Straight Truck or Van Trailer 5150.00/Trip <br /> B. Vans, Pickups, Autos <br /> $ 75.00/Ma ight <br /> C. Per Diem required) <br /> (If overnight stay req <br /> D. Materials/Equipment/Supplies <br /> All itemized disposal prices include supplies, drums, and packing media. The <br /> following materials and equipment list are for any additional supplies required by <br /> the counties. <br /> 85-gallon salvage drum $ 175.00 <br /> 55-gallon 17C, 17H, 17E drum $ 44.00 <br /> 30-gallon 17H drum $ 47.00 <br /> 20-gallon fiber 21C $ 27.00 <br /> 5-gallon 37A drum $ 13.00 <br /> Cubic yard boxes . $ 19.50 <br /> Absorbant $ 12.00 <br /> Vermiculite $ 12.00 <br /> Silkwik (corn cobs) $ 4.00 <br /> 4 mil liners $ 4.00 <br /> Reactive bags $ 2.00 <br /> Forklift or tent Q Cost <br /> Protective gear <br /> Level I $ 25.00/man/day <br /> Level II $ 35.00/man/day <br />