Browse
Search
Agenda - 10-05-94-X-D
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 10-05-94 Regular Mtg.
>
Agenda - 10-05-94-X-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2016 8:34:17 AM
Creation date
10/7/2016 8:32:50 AM
Metadata
Fields
Template:
BOCC
Date
10/5/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
X-D
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23. <br /> MEMORANDUM <br /> TO: Gene Bell, Planner III <br /> FROM: <br /> Slade cCalip, Planner II <br /> DATE: September 6, 1994 <br /> SUBJECT: 1996-2002 Possible TIP Project Requests <br /> One of the purposes of the Board of Transportation's annual TIP <br /> Public Hearing is to gather input from the public and local elected <br /> officials as to projects that they would like to see in next year's <br /> TIP. Toward that goal the following transportation projects are <br /> needed by Orange County and are long range in nature. <br /> 1) That a Long Range (20 year) Transit Development Plan for <br /> Orange County be funded: The purpose of this study would be to <br /> plan for and coordinate local transit development with ongoing <br /> state and regional transit projects and plans . An example of <br /> an ongoing state transit projects is the development of a High <br /> Speed Rail Corridor from Raleigh to Charlotte; a feasibility <br /> study should be performed to determine whether Hillsborough <br /> should be a stop along this route. An example of an ongoing <br /> regional transit project is the Triangle Fixed Guideway Study; <br /> if this study becomes the 20 year Regional Transit Plan for <br /> the Triangle Region there should be a plan to coordinate local <br /> transit with regional transit. <br /> 2 ) That "Park & Ride" lots be included in the design of the <br /> interchanges for project 1-305 (widening of 1-85 to six lanes <br /> and reconstruction of interchanges from Orange Grove Road to <br /> Durham County Line) . These lots if convenient to major <br /> highways promote and accommodate the use of carpools and <br /> vanpools. <br /> Next year at this time the results of three transportation studies <br /> currently being performed will provide information on needed <br /> transportation facilities and programs. Ongoing studies include: <br /> a) Orange County Traffic Congestion Study - an analysis of the <br /> major roadways and intersections in the County that rates the <br /> amount of congestion at each facility. <br /> b) Bicycle Route Suitability Study - an analysis of the DCHC <br /> Planned Bicycle Routes to determine the level of interaction <br /> between vehicular traffic and bicyclists . <br /> c) Orange County Transportation Plan - developed cooperatively <br /> with the HillSloorough Transportation Plan (currently being <br /> developed) to identify transportation needs and priorities . <br />
The URL can be used to link to this page
Your browser does not support the video tag.