Orange County NC Website
7 <br /> agreement as hereinafter set out; and in consideration of the <br /> benefits, assistance and mutual obligations to be received and <br /> performed by the parties hereunder, the COUNTY and OWASA, for <br /> themselves, their successors and assigns, do mutually agree as <br /> follows : <br /> 1 . OWASA shall provide administrative and technical services <br /> and assistance as regards to the design, permitting, <br /> construction, administration and operation and maintenance of the <br /> Subdivision wastewater system. <br /> 2 . OWASA shall charge the COUNTY and the residents of the <br /> Subdivision for its services under this Agreement, which charge <br /> shall be, with respect to the design, permitting and construction <br /> of the wastewater system, OWASA's actual direct and indirect <br /> costs of providing such service including, but not limited to, <br /> consultants ' fees, legal and administrative costs, capital <br /> facilities fees and construction contract costs . OWASA operation <br /> services (hereafter referred to as "utility services " ) shall be <br /> billed directly to the residents of the Subdivision and shall be <br /> rates , fees and charges calculated by OWASA as those necessary to <br /> recover the direct and costs of the services provided, <br /> including reasonable reserves for maintenance and replacement of <br /> the facilities necessary to provide the services to the <br /> Subdivision, and a reasonable charge representing recovery of a <br /> share of the cost of OWASA's existing capital plant and <br /> facilities 04418#00#0444::::10000::::::WiliitibtlOOMOIMMOON <br /> iii.iiipeaNZ414A. The rates and charges may be different from <br /> 3 <br />