Browse
Search
Agenda - 09-06-1994-IX-C
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 09-06-94 Special Mtg.
>
Agenda - 09-06-1994-IX-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 4:15:26 PM
Creation date
10/6/2016 4:13:48 PM
Metadata
Fields
Template:
BOCC
Date
9/6/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26 <br /> the Piney Mountain Subdivision only, a subdivision of approximately <br /> 120 acres located within Chapel Hill Township approximately one <br /> mile west of the Orange/Durham County line on the north side of <br /> Mount Sinai Road (SR 1718) . It encompasses fifty-nine platted <br /> residential single family lots described as Piney Mountain <br /> Subdivision Phase I, Lots 1-24 and Phase 2 , Lots 25-59, as recorded <br /> in Plat Book 49, Pages 85 & 86, Plat Book 52 , Page 183 , and Plat <br /> Book 58, Pages 129 & 130 . <br /> 3 . The sewer main and related facilities constructed in <br /> accordance with this Agreement to serve the Piney Mountain <br /> Subdivision, and originally connected to the City of Durham main at <br /> the county line, will be connected to OWASA, mains when the same may <br /> be constructed in the area proximate to Piney Mountain Subdivision, <br /> and the cost of construction of facilities and connections to join <br /> this line to future OWASA lines shall be paid on a pro-rata basis <br /> by the owners of lots within the Piney Mountain Subdivision. <br /> Likewise, if for any reason OWASA is unable to or determines not to <br /> continue its agreement with the City of Durham providing for the <br /> City of Durham to receive and treat waste from Piney Mountain <br /> Subdivision through the line to be constructed hereunder, the <br /> owners of lots in Piney Mountain Subdivision shall be responsible <br /> for and shall pay to OWASA the cost of an appropriate line and <br /> connection to the OWASA sewer collection system as may be necessary <br /> to connect the Piney Mountain system to OWASA collector mains <br /> leading to OWASA's wastewater treatment facilities . Any such <br /> connection to OWASA's wastewater collector mains and wastewater <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.