Browse
Search
Agenda - 09-06-1994-IX-C
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 09-06-94 Special Mtg.
>
Agenda - 09-06-1994-IX-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 4:15:26 PM
Creation date
10/6/2016 4:13:48 PM
Metadata
Fields
Template:
BOCC
Date
9/6/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-C
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21. <br /> extensions into the Rural Buffer; that Policy states, in pertinent <br /> part, as follows : <br /> "Public water and sewer facilities should be extended in <br /> accordance with the Land Use Element of the Orange County <br /> Comprehensive Plan. Such facilities will be encouraged, where <br /> they are available, in the Plan's Urban and Transition areas, <br /> and will be discouraged in Rural and Agricultural areas, <br /> except where their provision will enhance the rural character <br /> and provide for open space by allowing clustered development. " <br /> and, <br /> "Outside of Transition Areas, extension of water or sewer <br /> systems will only occur to provide service to an essential <br /> public facility, such as a school, or to remedy a public <br /> health emergency not otherwise correctable, such as a failing <br /> septic tank or failing package treatment plant( . ) ; " and, <br /> WHEREAS, the parties and the Towns of Chapel Hill and Carrboro <br /> have agreed that the Piney Mountain Subdivision petition ought to <br /> be allowed, notwithstanding the limitations and policy preferences <br /> against public sewer extensions contained in the Joint Planning <br /> Area Land Use Plan, as specifically contemplated under the Orange <br /> County Water and Sewer Policy, as necessary to alleviate a public <br /> health emergency, but without thereby intending or effecting any <br /> modification or other limitation to the continuing effect of the <br /> Joint Planning Area Land Use Plan's restrictions on public sewer <br /> extensions or connections within the Rural Buffer; and <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.