Orange County NC Website
6 <br /> COST ESTIMATE FOR <br /> Jail Addition <br /> Hillsborough, North Carolina <br /> Trigon Proposal No. 031-94-036-P <br /> Field Services <br /> 1. Mobilization, per occurrence $ 150.00 <br /> 2. Borings <br /> Less than 60 bpf <br /> 4 borings x 20 feet/boring x $7.50/foot 600.00 <br /> Greater than 60 bpf <br /> 4 borings x 10 feet/boring x $9.50/foot 380.00 <br /> 3. Boring Layout <br /> Engineer, 2 hours x $45.00/hour 90.00 <br /> Subtotal $- 1,220.00 <br /> Engineering Services <br /> Engineering, Drafting and Secretarial Support <br /> for the Preparation of an Engineering Report, <br /> estimated 550.00 <br /> Subtotal $ 550.00 <br /> Total Estimated Cost $1,770.00 <br />