Orange County NC Website
5 <br /> Mr. Glenn Eason <br /> July 27, 1994 <br /> Page Two <br /> PURPOSE AND SCOPE <br /> The purpose of the subsurface exploration will be to e_xplore the general subsurface <br /> conditions in the area of the proposed additions and to evaluate those conditions with regard to <br /> the design and construction of foundations and floor slabs. For purposes of this proposal, seven <br /> (7) soil P boring aze_,p osed; four borings for the jail addition and three borings for the <br /> courthouse addition. Boring depths are proposed at 30 and 20 feet, respectively, or to refusal. <br /> In each boring, Standard Penetration Tests will be performed in general accordance with ASTM <br /> D 1586-84 at suitable spacings to characterize the general subsurface conditions of the site. <br /> The borings will be staked in the field by Trigon using the existing onsite structures as <br /> references. Access to the borings appears to be clear. Since the borings may be advanced to <br /> refusal, some hard drilling will likely be required. We have budgeted for potential hard drilling. <br /> The results of the field testing will be summarized in a written report prepared under the <br /> direction of a registered professional engineer. The report will address the suitability of the <br /> subsurface conditions at the site for construction of foundations and slabs. Construction <br /> considerations regarding subgrade preparation, presence of groundwater, presence of rock, and <br /> fill compaction criteria will also be addressed. <br /> ESTIMATED FEE AND SCHEDULE <br /> Based on the scope of services outlined above, our estimated fee to perform an <br /> exploration for the jail and courthouse additions is $2,550. If a geotechnical exploration is to <br /> be performed for the jail addition only, an estimated fee of $1,770 is proposed. Our services <br /> will be provided on a time and materials basis at the appropriate unit fees using the estimated <br /> fee as a maximum not to exceed without your approval. If subsurface conditions are <br /> encountered that suggest modification to the proposed scope as previously noted, you will be <br /> contacted immediately for both your review and authorization. We can usually begin the field <br /> portion of the subsurface exploration within a few days after receiving formal authorization to <br /> proceed. <br /> AUTHORIZATION <br /> This proposal is an agreement for our services. Verbal authorization can be provided for <br /> scheduling of services; however, for insurance purposes, we will require written authorization <br /> prior to the mobilization of our personnel and equipment to the site. If our proposal is accepted, <br /> please take a few moments to complete and return the attached Proposal Acceptance Sheet. <br /> Please note the general terms and conditions on the back of the sheet, and that our terms for <br />