Browse
Search
Agenda - 09-20-1994
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 09-20-94 Regular Mtg.
>
Agenda - 09-20-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 3:28:25 PM
Creation date
10/6/2016 2:53:53 PM
Metadata
Fields
Template:
BOCC
Date
9/20/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
services (hereafter referred to as "utility services" ) shall be <br /> billed directly to the residents of the Subdivision and shall be <br /> rates, fees and charges calculated by OWASA as those necessary to <br /> recover the direct and indirect costs of the services provided, <br /> including reasonable reserves for maintenance and replacement of <br /> the facilities necessary to provide the services to the <br /> Subdivision, and a reasonable charge representing recovery of a <br /> share of the cost of OWASA's existing capital plant and <br /> facilities used to provide service to the subdivision. The rates <br /> and charges may be different from those charged customers of <br /> OWASA's existing sewer system, and shall include provisions for <br /> recovery of such direct and indirect costs as may be incurred and <br /> paid to the City of Durham for its acceptance and treatment of <br /> the wastewater from the Subdivision. <br /> 3 . Through the completion of construction and the connection of <br /> the Subdivision wastewater system to the Durham wastewater <br /> system, OWASA shall render a bill by monthly invoice to the <br /> COUNTY as service is provided by OWASA and shall provide to the <br /> COUNTY bills as frequently as required by the payment schedule <br /> specified under construction and consulting service contracts for <br /> services other than those provided by OWASA. The COUNTY shall <br /> make payment to OWASA after construction contract and other <br /> invoices are provided to it. Utility service billings will be <br /> made directly to the residents of the Subdivision and shall <br /> contain such terms and conditions as are customary and as are <br /> deemed fiscally prudent by OWASA. The parties agree that the <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.