Browse
Search
Agenda - 09-20-1994
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 09-20-94 Regular Mtg.
>
Agenda - 09-20-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 3:28:25 PM
Creation date
10/6/2016 2:53:53 PM
Metadata
Fields
Template:
BOCC
Date
9/20/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be the responsibility of the homeowner whose home is served by the <br /> STEP system. The parties agree that the Subdivision wastewater <br /> system will not be connected to the Durham wastewater system until <br /> such time as the COUNTY receives ( 1) certification from a <br /> professional engineer employed by the Piney Mountain Subdivision <br /> homeowners served by STEP systems of the needed repair or <br /> replacement of each STEP system which needed repair or replacement <br /> has been approved by OWASA; (2 ) a cost estimate of the cost of <br /> repair or replacement of all of the STEP systems needing repair or <br /> replacement certified by the homeowners ' professional engineer; and <br /> ( 3) a deposit from the Association, on behalf of the homeowners <br /> served by STEP systems needing repair or replacement, of 110% of <br /> the amount of the certified cost estimate of the cost to repair or <br /> replace all of the STEP systems needing repair or replacement. The <br /> COUNTY agrees to account to the Association for the funds deposited <br /> as provided in this Agreement and agrees that it will maintain the <br /> money deposited with it for the STEP system repairs or replacements <br /> in a designated project fund and will draw money from that fund <br /> payable to others for the certified repair or replacement work. <br /> The Association, on behalf of the homeowners served by STEP systems <br /> needing repair or replacement, acknowledges and agrees that it is <br /> obligated to pay all costs and expenses in the design, bidding, <br /> contract award, construction, regulatory approval and permitting of <br /> the STEP systems needing repair or replacement, and that its <br /> obligation is absolute and not dependent on any other source of <br /> funds, available to the COUNTY or OWASA to pay these costs and <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.