Browse
Search
Agenda - 09-20-1994
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 09-20-94 Regular Mtg.
>
Agenda - 09-20-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 3:28:25 PM
Creation date
10/6/2016 2:53:53 PM
Metadata
Fields
Template:
BOCC
Date
9/20/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
How will the school differ in design from our other schools? <br /> Educational practices and school organizations have changed significantly since our other <br /> elementary schools were built. Today, students are more active, working at centers on projects while <br /> their teachers serve as coaches. There are more supplies and equipment required and, of course, <br /> technology has become a way of life. Teachers work in teams with their colleagues and students <br /> move flexibly within these teams. An effort is made to create a family-like setting rather than a cold <br /> institutional one with seemingly endless corridors and identical rooms. Classroom clusters will have <br /> their own student restrooms, storage and office facilities to support after-school programs, and possi- <br /> bly, year-round schools. There will be a variety of instructional spaces with classrooms being supple- <br /> mented with areas for both small and large group instruction. <br /> How much will it cost? <br /> The projected cost of the elementary school is $10.6 million. This includes construction, equip- <br /> ment and furnishings, technology, the media collection, textbooks, and other one-time start-up costs. <br /> Two years ago the cost of the project was estimated to be $10 million for construction and furnishings <br /> and an additional $1 million for technology. Since that time, it is estimated that construction costs <br /> have increased by approximately 20 percent due to the number of large scale public projects being <br /> bid this year. Consequently, the size of the school was reduced in an effort to stay within this budget. <br /> The school will cost $71 per square foot, and the state average for schools is approximately $69-$70. <br /> How will it be paid for? <br /> Financing the school is the responsibility of the Orange County Commissioners; however, <br /> there has been a preliminary agreement that the school will be funded through the school district's <br /> capital budget and impact fees. This means that no tax increase would be necessary to construct the <br /> school. The Commissioners will sell certificates of participation or pursue other private financing <br /> options to raise the necessary revenues. <br /> Will it be energy efficient? <br /> The elementary school will be designed along the same lines as McDougle Middle School <br /> which was part of a state pilot program for designing energy efficient schools. Energy efficient fea- <br /> tures include daylighting, energy efficient glass, canopies to screen direct sunlight, energy efficient <br /> lighting and heating and cooling systems, and highly insulated roofing systems. Each classroom will <br /> have energy efficient controls which can be more closely regulated rather than one switch controlling <br /> one corridor or the whole school. All cooking equipment will be fueled by natural gas which is consid- <br /> ered to be a clean, efficient and less expensive fuel. <br /> What is the construction schedule? <br /> If approvals are obtained as scheduled, ground could be broken by December, 1994 with the <br /> school scheduled for completion by June, 1996. <br /> All six elementary schools are over capacity without mobile classrooms <br /> Elementary School Capacity* 1994 Enrollment Number of Mobile Classes <br /> Carrboro 600 635 1 <br /> Ephesus 500 634 5 <br /> Estes Hills 550 582 1 <br /> Frank Porter Graham 575 676 2 <br /> Glenwood 450 452 4 <br /> Seawell 475 683 6 <br /> Total 3,150 3,662 19 <br /> *does not include mobile classrooms <br />
The URL can be used to link to this page
Your browser does not support the video tag.