Orange County NC Website
-0,4F- , 9, Do qv• <br /> „gv—xszooyarzrnroraaw-ews—wwoms—vawsotsr,.zwuu, <br /> .6 <br /> ,"4:04,44,14000,,,,,A,. : ‘,,,..„,,e0,40wist4,40440,001:00{,mvotoritorlivvoi * 4044.10 <br /> tittMirrti*Ogsgw$''., ':' ,(;,:/g7tits*.y',,,,•'''',:,s'llVItorlititat”vfteteerg*(04410 <br /> ,AL.:ota:,)ept;gvif:AL. .4it.,4.,:4;.:',44, ... ,:.:41,, ,:f.4maititiottetAtititieffMt~fisiti <br /> ttsitNoarnrehpot:i,s ' 'Air o':,,,ti,,zw,v.0',,. zetiommuoatipeflotopagat <br /> toosiptalIm4,,z,ttv,::::0::, )4.f 0004. .:,... It„' -ted Kw.viteopreNowm4,035,,w,o* <br /> p-,44 s' P',,‘,''. 141W•..*-?•-.: t4 .%/ ' v `f,,fe ' '-;' 11 r Aot,40444:44404,041,4041 <br /> „,,,c4,>4” ,., t f%f4.:4,„e4e.f W,:f•p• •;::•,°,,,,,. .,'„ 4 .1. ,trg', 1, •''' i ,n,,, • r Atta0V;.1. 4*.,'::a YZVW0.01 <br /> *ettef',,, „a4514070,0*.i% $,•v,41,t,*,,.w:z.''.' '0! ,z,.,,..e,V, , *i, aft& „-. <br /> Chapel Hill-Carrboro City Schools September 1994 <br /> Commissioners will discuss new school on September 20 <br /> Elementary school planning process began three years ago <br /> The Orange County Board of Commissioners will discuss the proposed new elementary <br /> school again on Tuesday, September 20 in a meeting at OWASA which begins at 7:30 pm. The <br /> commissioners began discussions of the new school's funding on September 6 and are ex- <br /> pected to determine the funding level of the new school so that construction can proceed. <br /> Plans call for the school to open in 1996. The last elementary school that was built in the dis- <br /> trict, Ephesus Elementary, was constructed in 1972 or 22 years ago. <br /> Questions and answers about the proposed new elementary school <br /> When was a new elementary school first proposed by the Board of Education? <br /> In 1990 the Long-Range Facility Planning Committee recommended to the Board of Education <br /> that the district begin planning immediately for the construction of a new elementary, middle, and high <br /> school, with a second elementary school recommended prior to the end of the decade. The middle <br /> and high schools were included in the 1992 bond referendum, but the Commissioners eliminated the <br /> elementary school to keep costs down. <br /> Why is another elementary school needed? <br /> The capacity of the district's present six elementary schools is 3150, excluding mobile class- <br /> rooms. Enrollment in the elementary schools stands at 3662 today. It is projected to increase to <br /> 3931 by 1996-97. There are 19 mobile classrooms on our elementary campuses at this time. <br /> Where will the school be built? <br /> The school will be built on the same campus as McDougle Middle School. McDougle is lo- <br /> cated near the intersection of Old Fayetteville Road and Hillsborough Road in Carrboro. In fact, the <br /> elementary school will be attached to McDougle Middle and will share a media center, cafeteria and <br /> kitchen, and mechanical equipment. <br /> Which students will attend the school? <br /> A redistricting committee is being formed this fall to redraw attendance boundaries; therefore, <br /> we cannot say with certainty right now who will attend. <br /> How many students will the school hold? <br /> The school is designed for approximately 600 students in grades K-5, 18 pre-schoolers, and <br /> 22 exceptional education students (640 total). (continued on reverse) <br />