Browse
Search
Agenda - 09-20-1994
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 09-20-94 Regular Mtg.
>
Agenda - 09-20-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 3:28:25 PM
Creation date
10/6/2016 2:53:53 PM
Metadata
Fields
Template:
BOCC
Date
9/20/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> 2. Could we provide a more detailed breakdown of the budget? <br /> New Construction (98,962 sq. ft. @ $71.75 per sq. ft.) $7,100,524 <br /> When we developed this budget several months ago, <br /> this per square foot estimate seemed reasonable. As we <br /> move into the fall, however, school districts are running into <br /> bids that are 15-20 percent higher than expected and are <br /> even having difficulty attracting the minimum of three <br /> bidders. SDPI recently recommended using $75 per <br /> square foot. Consequently, although we have not revised <br /> this figure, there is a good possibility that other line items <br /> will need to be reduced in order to support the basic <br /> construction. <br /> Site Development (8.4%) 593,772 <br /> Site development includes clearing and grading <br /> (most of the site is wooded and some is in the watershed), <br /> preparation of the building pad, removing debris or <br /> mulching, construction of a bus loop and additional parking, <br /> storm drainage, play fields, fencing, signage, sidewalks on <br /> the site, and the planting of buffers. Site work for the middle <br /> school, by comparison, was more than $1.5 million. <br /> Fixed Equipment (5.3%) 380,000 <br /> This includes all casework in the classrooms, office <br /> and work areas; a retractable wall that will divide the <br /> elementary and middle school cafeterias, stage curtains for <br /> the multipurpose room, and serving lines for the cafeteria. <br /> Movable Equipment (5.6%) 400,000 <br /> Movable equipment includes classroom tables, <br /> desks, chairs, file cabinets, teacher desks and chairs, <br /> furniture for workrooms, conference rooms, and reception <br /> areas, and audiovisual equipment for all classrooms and <br /> the media center. <br /> Technology 550,000 <br /> Included in this line item are cabling for voice, video, <br /> and data, expansion of the switch in McDougle Middle <br /> School, source end equipment, all network hardware, all <br /> end-user hardware and systems software, telephones and <br /> voice mail, intercom and other safety and security systems. <br /> Non-Personnel Start-up Costs 333,270 <br /> This information was provided at the last meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.