Browse
Search
Agenda - 09-20-1994
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 09-20-94 Regular Mtg.
>
Agenda - 09-20-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 3:28:25 PM
Creation date
10/6/2016 2:53:53 PM
Metadata
Fields
Template:
BOCC
Date
9/20/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
funding strategy <br /> NEED. . . this need was identified in 1990 by a Tong. range planning <br /> committee . It needed to open this year but it was not included in <br /> earlier bond package. We have 5U() elementary school students <br /> more than we can house in our permanent facility , We have 19 <br /> temporary trailers . We will be 800 over in 199 when this school <br /> openS . The Kindergarten number was lowered by the state this year . <br /> That added 3 K classes . <br /> 99 , 000 square feet . . . near to the New Hope size . The flexibility <br /> to organize classes and the hands on approach and the need for <br /> support areas , We believe that we need to look at multi-track year <br /> roun schools . <br /> COST— The cost is based. on ? per square foot . jThat figure is <br /> less comfortable this year as reports are coming in from other <br /> schools . The school system is going to be paying the debt service <br /> and principal on this school , If the contingency does not need to <br /> be expened it would be in their interest to do that . <br /> FUNDING The school is not being financed through bonds . Property <br /> taxes were increased to pay the debt on those bonds . The impact <br /> fee is being used to build these facilities . This is a small piece <br /> of the payment . The remained will be ?Pay as you go??? <br /> BOB STOCKING , Technology co-ordinator . Teacher/voter/taxpayer . <br /> This is not an extravagent place but it is a place that <br /> professional exjoy going . The physical plant is inviting to <br /> students and staff . It welcomes kids . It is effectively designed . <br /> Teams of teachers are assigned rooms and they decide how to use it . <br /> Elective teachers do not feel they are imposing , Turf battles do <br /> not occur . Office space is shared and excourage contact with <br /> parents . Phones are available for the first time as are conference <br /> rooms . McDougal makes the statement that we are treating you as ' <br /> professionals . <br /> BOARD QUESTIONS <br /> Moses indicated that 10 minutes will be given . <br /> JEAN COLE , . Putting Children First . opposed the new elern school <br /> proposal . McDougal has won design awards and we do not need to <br /> seek more of that elitist , As risk children , 70% our nc . schools <br /> are 25 years old , Exisitng buildings are not going to get <br /> maintajned, We need safe schools not design awards . The school <br /> system is the spoiled child . Move the fifth. graders to the middle <br /> schools and study the issue . It is time to say no <br /> PETER MORACCMBE Showed the project environment report on the <br /> flooding of the school , One reason to delay/reject is that our <br /> administrators are fiscally irresponsible , Broke promises/ lied and <br /> showed poor management . $100 , 000 was wasted , Asked the BOCC to <br /> provide more oversite. The school needs to be a bond. referendum <br />
The URL can be used to link to this page
Your browser does not support the video tag.