Orange County NC Website
U011 ILGIS <br />IOLAI Imi <br />1•U1SlLR PLAN <br />CONS IRUL'I 1014 <br />11-1_=' 11UR1111i <br />I` wit <br />.,- <br />COST <br />CONSTRUCT] ON <br />65,ouu t.11l get <br />Des ignworks <br />Carrboro <br />$25./hr. <br />work done except <br />$25 /hr <br />Drawings ready in 2 months <br />for remodeling of <br />courtroom & handica <br />Cogswell/ <br />Chapel Hill <br />$16,440 <br />Drawings ready in 45 months <br />Hausler <br />for everything <br />Associates <br />Peloquin <br />Chapel Hill <br />Required 202,18 <br />12% <br />Drawings ready in 3 months <br />Associates <br />Optional 54,80 <br />for everything <br />Contingency 12,84 <br />269,83 <br />James M. Webb <br />Chapel Hill <br />9.75% <br />Drawings ready in 3 months <br />for everything <br />City Planning <br />Chapel Hill <br />$5,000 <br />Up to 50,000 -10% <br />100;000 -8.5% <br />Master Plan - 2 months <br />200,000 -8.0% <br />Drawings ready in 90 days after <br />300,000.7.4% <br />approval <br />Space <br />Carrboro <br />Not exceed <br />_7% <br />Master Plan - 2 months <br />Builders <br />$4,100 <br />Drawings ready in 6 months <br />after approval <br />8urnstudio <br />Raleigh <br />$3,660 <br />Required 163,641 <br />7 to 10% <br />Master Plan - 12 weeks <br />Optional 66,200 <br />229 ,841 <br />Giles & <br />Gurlitz <br />Chapel Hill <br />hourly rate - to <br />% of construc- <br />Drawings ready in 8 weeks <br />be negotiated <br />tion cost - to <br />be negotiated <br />Integrated <br />Chapel Hill <br />$9,500 <br />Master Plan - 75 days <br />Energy Systems <br />,(( <br />f <br />1 <br />W <br />C1 k�-" <br />