Browse
Search
Agenda - 10-06-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 10-06-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 10:52:06 AM
Creation date
10/5/2016 10:42:41 AM
Metadata
Fields
Template:
BOCC
Date
10/6/1981
Meeting Type
Public Hearing
Document Type
Agenda
Document Relationships
Minutes - 19811006
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
67F.; 769 <br /> C. <br /> REHABILITATION PLAN <br /> (a) Current settling ponds will be left as lakes, with the banks <br /> being sloped and seeded. <br /> The plant area may be left for the plant area of another <br /> industry, as a factory foundation, or as parking area, as needed. Barring <br /> any of the above, the area may be plowed and seeded with some type of suit- <br /> able vegetation. <br /> Spoils piles will be sloped to prevent sliding, and seeded <br /> with a suitable type of vegetation to prevent erosion. <br /> The pit will be filled with water from underground springs <br /> and Phial's Creek, and we anticipate that OWASA will want it as a reservoir, <br /> as it is currently using to great advantage the pit from the old American <br /> Stone Company Quarry. <br /> (b) The rehabilitated topo should resemble the original topo map <br /> of the area with the following exceptions: the berm area will be built up <br /> to an unknown height and width; the settling pond and the pit will grow to <br /> unknown sizes and depths, all depending on the longevity and volume of <br /> business over the years of operation. Our plan is to leave the settling <br /> pond as a lake and to allow the pit to fill with water and thereby be a <br /> lake or a reservoir. <br /> An accurate topographical map of the berm area, settling <br /> pond, and pit is impossible to produce at this time. <br /> (c) Because of the nature of the extraction process, it is <br /> impossible to predict with any accuracy the date by which operation will <br /> be concluded. However, we anticipate that the surface rehabilitation will <br /> .40Eirk <br /> be concluded within 12 months of the date operations cengo. • <br /> (d) Equipment will be removed for use at another site or sold. <br /> Structures also will be removed if not needed by the successor. Spoil <br /> piles, as mentioned above, will be sloped and seeded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.