Browse
Search
Agenda - 10-06-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 10-06-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 10:52:06 AM
Creation date
10/5/2016 10:42:41 AM
Metadata
Fields
Template:
BOCC
Date
10/6/1981
Meeting Type
Public Hearing
Document Type
Agenda
Document Relationships
Minutes - 19811006
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
767 <br /> 67,3 <br /> 5. Equipment used in Extraction. <br /> Standard equipment used in open pit quarrying and crushing operations <br /> are used by the Company. A detailed list of such equipment can be provided if <br /> aecessary. <br /> 6n Phasinz of the Ineration. <br /> Generally, the operation can be divided into five phases: (1) <br /> drilling and shooting, (2) loading, (3) transporting, (4) crushing, and <br /> (5) stocking. <br /> The phases are related in that they track the processing of the <br /> stone from the point of actual extraction to the final, stockpile from which <br /> it is sold. <br /> 7. Practices to Comply with Performance Standards. <br /> (a) DIRECT ILLUMINATION. <br /> The operations are confined to daylight hours and no <br /> illumination is necessary. <br /> (b) SOUND LEVELS. <br /> Because of the centralized location of the plant and <br /> pit on the property tract, and because of the earth berms and heavy natural <br /> foliage surrounding most of the operations, we anticipate no problems in <br /> meeting the sound limitations as set forth in the ordinance. <br /> As shown on the site plan, the pit and plant are a minimum of <br /> 200 feet from the nearest property boundary, and substantially further than <br /> that from the nearest residential, commercial, or industrial building not <br /> on quarry property. We have consulted an expert in this field who has <br /> advised us that we are currently meeting and can continue to meet this <br /> requirement, <br /> -17TIA-177"1-71r;M7717' <br /> .• ' <br /> ;,:::;•11.7:1 <br /> , <br /> , , • *; . <br /> .r`t: <br />
The URL can be used to link to this page
Your browser does not support the video tag.