Orange County NC Website
SCIIEE7UIE E <br /> .. Miscellaneous Inspections <br /> 1.0 Existing Alternative'I Alternative II Alternative III. P1 rernative IV <br /> Decks ** $ 20.00 $ 25.00 $ 30.00 $ 40.00 <br /> Mobile Home $10.00 20.00 25.00 30.00 40.00 <br /> Mobile Home Park 25./park (INCLUDED IN ZONING FEES) <br /> plus 1/ <br /> space <br /> Modular Units (unit installation and <br /> foundation any size) ** 60,00 75.00 90.00 120.00 <br /> Insulation Permit (when required) 20.00 25.00 30.00 40.00 <br /> New Accessory Buildings Jmenufactured, <br /> assembled, or packaged) ** 20.00 25.00 30.00 40.00 <br /> New Accessory Buildings-(Site Built)) ** 40.00 50.00 60.00 80.00 , <br /> Electrical Temporary Service <br /> 60A 5.00 20.00 25.00 30.00 40.00 <br /> 60A - up 10.00 20.00 25.00 30.00 40.00 <br /> Signs <br /> 1 sq. ft. to 399 sq. ft. ** plus/10 20.00 25.00 30.00 40.00 <br /> over 400 sq. ft. ** p1hs/10 60.00 75.00 90.00 120.00 <br /> Installation of Wood Burning <br /> Stove or Other Alteration 0.00 20.00 25.00 30.00 40.00 <br /> Miscellaneous Electrical 8.00 20.00 25.00 30.00 40.00 <br /> Miscellaneous Plumbing 5.'00 20.00 25.00 30.00 40.00 <br /> Miscellaneous Building- 20.00 25.00 30.00 40.00 <br /> Electrical-Mobile Home 15.00 0.00 0.00 0.00 0.00 <br /> SCHEDULE F <br /> Electrical Service Changes <br /> Single Phase - 30 - 50 A 15.00 20.00 25.00 30.00 45.00 <br /> 60 - 100 A 20.00 20.00 25.00 30.00 45.00 <br /> 101 - 200 A 25.00 20.00 25.00 30.00 45.00 <br /> 125 - 150 A 25.00 20.00 25.00 30.00 45.00 <br /> 175 - 200 A 30.00 1 20.00 25.00 30.00 45.00 <br /> 400 A 30.00 20.00 25.00 30.00 45.00 <br /> Three Phase - 30 - 50 A 20.00 40.00 50.00 60.00 90.00 <br /> 60 - 100 A 25.00 40.00 50.00 60.00 90.00 <br /> 2- . <br />