Orange County NC Website
5 <br /> Memo Bill Laws <br /> September 3, 1981 <br /> Page 2 <br /> Some contractors will be upset by such a large increase contained <br /> in Alternative II and IV. Of course, ultimately all costs will be <br /> passed on to the consume;. <br /> Alternative II will allow the Division to become self sufficient <br /> over a two year average. This would occur if the construction activity <br /> increases over the next two years. Alternative III provides for self <br /> sufficiency this year. Inherent in Alternative II and IV is a review <br /> and possible revision for next year. <br /> By next spring, the cross training of insoectors will be sufficiently <br /> advanced to allow us to mandate our double inspections. For instance we could <br /> mandate inspecting the temporary Power and footing together, the plumbing <br /> and mechanical rough-in together, the electrical and building final together, <br /> etc. This way we could reduce the total number of inspection trips for <br /> each new dwelling from eleven to either five or six!! <br /> A policy is included concerning refund of Permit fees. <br /> The mobile Some fee is significant. We have allowed our electrical <br /> inspector to inspect for building, plumbing and electrical compliance. <br /> This has reduced our trips front three or four to one: The four Alternative <br /> schedules reflect only one trip. <br /> Table VI of the calculation sheet estimates the budgeted revenue, <br /> projected revenue from the existing fee schedule, budgeted revenue, and <br /> estimated revenues fro the four Alternatives. Alternative II produces a <br /> deficit of about 16,210 based on estimated revenues of $85,250. Alternative <br /> III generates $104,315 of estimated revenue with a surplus of about $2,845. <br /> We recommend Alternative III be adopted. Orange County should review <br /> and adjust the inspections fee schedule during budget preparation each year. <br /> Another important recommendation is the charge for Inspection <br /> Failures. We estimate this will reduce our total trips and make contractors <br /> more responsive to our inspectors. <br /> ENCLOSURE <br /> JP/sw <br />