Browse
Search
Agenda - 09-08-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 09-08-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 11:18:04 AM
Creation date
10/5/2016 10:19:02 AM
Metadata
Fields
Template:
BOCC
Date
9/8/1981
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19810908
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Memo Bill Laws <br /> September 3, 1981 <br /> Page 2 <br /> Some contractors will be upset by such a large increase contained <br /> in Alternative II and IV. Of course, ultimately all costs will be <br /> passed on to the consume;. <br /> Alternative II will allow the Division to become self sufficient <br /> over a two year average. This would occur if the construction activity <br /> increases over the next two years. Alternative III provides for self <br /> sufficiency this year. Inherent in Alternative II and IV is a review <br /> and possible revision for next year. <br /> By next spring, the cross training of insoectors will be sufficiently <br /> advanced to allow us to mandate our double inspections. For instance we could <br /> mandate inspecting the temporary Power and footing together, the plumbing <br /> and mechanical rough-in together, the electrical and building final together, <br /> etc. This way we could reduce the total number of inspection trips for <br /> each new dwelling from eleven to either five or six!! <br /> A policy is included concerning refund of Permit fees. <br /> The mobile Some fee is significant. We have allowed our electrical <br /> inspector to inspect for building, plumbing and electrical compliance. <br /> This has reduced our trips front three or four to one: The four Alternative <br /> schedules reflect only one trip. <br /> Table VI of the calculation sheet estimates the budgeted revenue, <br /> projected revenue from the existing fee schedule, budgeted revenue, and <br /> estimated revenues fro the four Alternatives. Alternative II produces a <br /> deficit of about 16,210 based on estimated revenues of $85,250. Alternative <br /> III generates $104,315 of estimated revenue with a surplus of about $2,845. <br /> We recommend Alternative III be adopted. Orange County should review <br /> and adjust the inspections fee schedule during budget preparation each year. <br /> Another important recommendation is the charge for Inspection <br /> Failures. We estimate this will reduce our total trips and make contractors <br /> more responsive to our inspectors. <br /> ENCLOSURE <br /> JP/sw <br />
The URL can be used to link to this page
Your browser does not support the video tag.