Orange County NC Website
rni <br /> LI "09 C F - Sf <br /> • <br /> AGENDA ATrAaLKENT 9 <br /> ORANGE COUNTY PLANNING DEPART:1,17NT <br /> 'ffrT.J.SBOROUGH <br /> NORTH CAROLLNA. <br /> 27278 <br /> L%. <br /> 4. if;-71 <br /> 'Fb 4.00 <br /> MEMO <br /> TO Bill Laws, Acting County Manager <br /> • <br /> FROM: Jim Polatty, Planning Director <br /> DATE: September 3, 1981 <br /> SUBJECT: Proposed Inspections Fee Schedule <br /> Please find enclosed the proposed Building Inspections Fee Schedule. <br /> There are four alternative fee schedules. Each is based on a different <br /> basis for achiev*ig a self sufficient building inspection division. The <br /> overall policy upon which these four alternatives are based is to achieve <br /> a self sufficient inspection division, defined as the total revenues <br /> generated from the fee schedule equaling costs and expenditures. • <br /> Tables I and II of the calcualtion sheet show the revenues and <br /> expenses were close to even from 1977 to 1980. In the last fiscal year, <br /> there was about a $35,500 deficit with the existing fee schedule. A <br /> $39,500 deficit is estimated for fiscal year 1981 using the present fee <br /> schedula, <br /> Table III shows that 1977-1979 were high activity years in building <br /> construction (> 400 permits) which were the years the inspection division <br /> was approximately self sufficient. On the other hand 1980 had a much <br /> lower activity, leading to the $35,500 deficit, 1981 is estimated to be <br /> a low activity year with about a $39,500 deficit. <br /> Planning staff counted the actual number of inspection trips in <br /> calendar years 1979 and 1980. Based on this data, Table IV shows the cost <br /> of each inspection trip using calendar year trip data (from Table III) and <br /> total inspection cost data (from Table II) . <br /> Alternative I is based upon each trip costing and earning $20.00. <br /> Alternative II is also based upon each trip costing and earning $25.00. <br /> Alternative III is set at $30.00 and Alternative IV is $40.00, <br /> The first policy the Board of Commissioners should make is whether <br /> to continue their policy of self sufficiency nor the Inspections Division, <br /> Next, the Board of Commissioners needs to decide what time frame to <br /> use in making the division self sufficient, Alternative I is based on <br /> high construction activity and would have to be in Place during a busy year. <br /> Alternative II is an average two years, one low volume and one high volume, <br /> Alternative III is designed for a low volume year, which we are projecting <br /> for this year, Alternative II has an advantage in that the increase in all <br /> fees is- calculated for two years. The oresent inspection fee schedule <br /> was adopted in 1375 and 1976 and to the best of my knowledge have not <br /> changed since then. <br /> • <br />