Browse
Search
Agenda - 09-08-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 09-08-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 11:18:04 AM
Creation date
10/5/2016 10:19:02 AM
Metadata
Fields
Template:
BOCC
Date
9/8/1981
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19810908
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• - <br /> 15 <br /> in any case which do not preclude or affect occupancy, and all <br /> other requirements of the Agreement have been met, the unit(s) <br /> must be accepted. An escrow fund determined by the PHA to be <br /> sufficient to assure completion for items of delayed completion <br /> must be required, as well as a written agreement between the PHA <br /> and the owner, to be included as an exhibit to the Contract, <br /> specifying the schedule for completion. If the items are not <br /> completed within the agreed upon time period, the PHA may tenni- <br /> : nate the Contract or exercise other rights under the Contract. <br /> If other deficiencies exist, the PHA must determine whether <br /> and to what extent the deficiencies are correctable, and whether <br /> the Contract Rents should be reduced. The owner must be notified <br /> of the PHA's decision. If the corrections required by the PHA are <br /> possible, the PHA and owner must enter into an agreement for the <br /> correction of the deficiencies within a specified time. If the <br /> deficiencies are corrected within the agreed period of time, the <br /> PHA must accept the unit(s) . <br /> Otherwise, the unit(s) may not be accepted, and the owner must <br /> be notified with a statement of the reasons for nonacceptance. <br /> No later than acceptance, the owner will be required to submit <br /> the local permits and approvals required as evidence of completion <br /> and the Actual Cost and Rehabilitation Loan Certifications , on the <br /> form provided by the Authority. As well as these certifications, <br /> the Certificate of Occupancy and any other required permits will <br /> be obtained from the owner at the time of acceptance. <br /> 4. Preparation of the HAP Contract <br /> The Rehabilitation Advisor will review the owner certifications <br /> immediately following the inspection and will compare the Actual Cost <br /> and Rehabilitation Loan Certifications to the Final Feasibility <br /> Analysis and approved change orders. Contract Rents will be recal- <br /> culated if rents specified in the Agreement need to be adjusted, <br /> pursuant to 24 CFR 409(d) Changes in Initial Contract Rents During <br /> Rehabilitation. If the HAP Contract is being signed before all minor <br /> deficiencies have been resolved, an agreement describing the remaining <br /> work items, their cost, and the date by which they will be completed <br /> will be executed and attached to the HAP Contract. <br /> Within one working day after acceptance of the unit, the <br /> Rehabilitation Advisor will prepare a HAP Contract with a complete <br /> file, to include the nrnnncal The. uAb 411 L_ . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.