Orange County NC Website
4 7 4 <br /> g. 4. Existing Parking and Circulation <br /> Under contract and nearing completion are general site improvements, <br /> consisting of paved and guttered parking areas and drives, and <br /> concrete walkways. These will provide permanent spaces for 85 cars, <br /> which is the requireu numoer specified by zoning .*:o 3ar7e zg <br /> buildings. The general circulation pattern of the upper parking area <br /> will allow fairly simple extension to accommodate additional parking <br /> areas, required by new buildings. This particular area is entered <br /> from Caldwell St Extension and serves the central parking needs of <br /> visitors and patients. <br /> p. 4 of 12 p. <br />