Browse
Search
Agenda - 08-24-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 08-24-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 11:27:19 AM
Creation date
10/5/2016 9:24:45 AM
Metadata
Fields
Template:
BOCC
Date
8/24/1981
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19810824
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4(3'' <br /> Webb Proposal p. 3 <br /> PHASE 5 cont. <br /> Verify Contractor's performance <br /> Conduct Final Inspection at completion <br /> Prepare As-Built Drawings <br /> Estimated Time for Phase 5. 90 days <br /> Fee Allocation for Phase 5. 207. of total <br /> Total Estimated Time for Project Planning and Construction: 200 days <br /> Architectural Fees, estimated at 8.257. of Construction Budget, are based on <br /> schedule of standard fees for projects of similar scope and complexity, <br /> published by North Carolina Dept. of Administration. <br /> Actual Fee Structure and Project Time would be subject to negotiation with <br /> Owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.