Browse
Search
Agenda - 08-24-1981
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1981
>
Agenda - 08-24-1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 11:27:19 AM
Creation date
10/5/2016 9:24:45 AM
Metadata
Fields
Template:
BOCC
Date
8/24/1981
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19810824
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
46q <br /> Webb Survey of Building p. 2 <br /> MAJOR DEFICIENCIES: <br /> The most serious drawback to safe and efficient use is the inadequate <br /> electrical distribution and lighting system. <br /> Another important deficiency is the lack of air conditioning and proper <br /> ventilation. The two problems are interrelated in that ample electrical <br /> service must be provided in order to install central cooling or window air- <br /> conditioners. Required power, supplied by Duke Power Co., is available at <br /> the site. The existing connection to the building, however, does not meet <br /> required standards. Use of appliances now creates hazards and causes power <br /> outages. <br /> The following list of recommended improvements outlines the most pressing <br /> remodeling needs; <br /> With regular maintenance and timely improvements the existing building can <br /> continue to be as useful as a new structure at much lower initial cost. <br /> RECOMMENDED MINIMUM IMPROVEMENT: <br /> 1. Electrical Distribution & Service Connection: <br /> New outlets, panels, and wiring to meet Code <br /> New service connection (400 amp. min.) from existing transformer <br /> Estimated Cost: 22,500.00 <br /> 2. Air Conditioning: <br /> Zoned central cooling system, ducted to rooms, served by two <br /> 10-ton cooling units <br /> Note: Refer to solar screen item below <br /> Estimated Cost: 45.000.00 <br /> 3. Solar shading screens for windows: <br /> Similar to equipment installed at Mental Health Center. Required <br /> to allow use of A/C equipment sizes specified above <br /> Estimated Cost: 12,000.00 <br /> 4. Windows: <br /> Replace with insulating sash or repair existing and install <br /> storm sash <br /> Estimated Cost 16,400.00 <br /> 5. Lighting and Ceilings: <br /> Acoustical suspended ceilings, with lay-in fluorescent fixtures <br /> Estimated Cost: 21,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.