Orange County NC Website
46q <br /> Webb Survey of Building p. 2 <br /> MAJOR DEFICIENCIES: <br /> The most serious drawback to safe and efficient use is the inadequate <br /> electrical distribution and lighting system. <br /> Another important deficiency is the lack of air conditioning and proper <br /> ventilation. The two problems are interrelated in that ample electrical <br /> service must be provided in order to install central cooling or window air- <br /> conditioners. Required power, supplied by Duke Power Co., is available at <br /> the site. The existing connection to the building, however, does not meet <br /> required standards. Use of appliances now creates hazards and causes power <br /> outages. <br /> The following list of recommended improvements outlines the most pressing <br /> remodeling needs; <br /> With regular maintenance and timely improvements the existing building can <br /> continue to be as useful as a new structure at much lower initial cost. <br /> RECOMMENDED MINIMUM IMPROVEMENT: <br /> 1. Electrical Distribution & Service Connection: <br /> New outlets, panels, and wiring to meet Code <br /> New service connection (400 amp. min.) from existing transformer <br /> Estimated Cost: 22,500.00 <br /> 2. Air Conditioning: <br /> Zoned central cooling system, ducted to rooms, served by two <br /> 10-ton cooling units <br /> Note: Refer to solar screen item below <br /> Estimated Cost: 45.000.00 <br /> 3. Solar shading screens for windows: <br /> Similar to equipment installed at Mental Health Center. Required <br /> to allow use of A/C equipment sizes specified above <br /> Estimated Cost: 12,000.00 <br /> 4. Windows: <br /> Replace with insulating sash or repair existing and install <br /> storm sash <br /> Estimated Cost 16,400.00 <br /> 5. Lighting and Ceilings: <br /> Acoustical suspended ceilings, with lay-in fluorescent fixtures <br /> Estimated Cost: 21,500.00 <br />