Browse
Search
Agenda - 03-27-2007-5n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-27-2007
>
Agenda - 03-27-2007-5n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 9:10:49 AM
Creation date
8/28/2008 11:30:08 AM
Metadata
Fields
Template:
BOCC
Date
3/27/2007
Document Type
Agenda
Agenda Item
5n
Document Relationships
Minutes - 20070327
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
RES-2007-025 Carramore - Preliminary Plan for Public Road
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />Development Process, Schedule, and Action <br />• First Action: Neighborhood Information meeting held on October 18, 2006. <br />• Second Action: Concept Plan approved by the Planning Board on November 1, 2006 with <br />the following conditions: <br />1. The intersection and road alignments on the Preliminary Plan shall be approved by <br />NCDOT office in Graham. <br />2. Homeowners Association documents that provide for maintenance of the Open Space <br />shall be submitted with the preliminary plan. Provisions shall be included in the <br />Homeowners Association documents that would prohibit tree cutting in the roadside Open <br />Space except for maintenance purposes. <br />3. Show proposed dedication of an additional 5 feet of right-of-way, or 35 feet from C/L of <br />existing R/W, whichever is greater, along Kerley Road on the Preliminary Plan. <br />4. Show easement location of subdivision sign on Preliminary Plan. <br />5. Any street lighting in Orange County shall be approved by Planning Department prior to <br />installation. <br />6. A traffic study shall be prepared and submitted with the Preliminary Plan that indicates <br />traffic patterns and traffic flows on Kerley Road. This study will be reviewed by the <br />Orange County Planning Staff to determine whether turn lanes are warranted on Kerley <br />Road. <br />• Third Action: Planning Board considered the Preliminary Plan on February 7, 2007. The <br />Planning Board determined that the conditions on the Concept Plan had been addressed and <br />unanimously recommended approval. <br />• Fourth Action: <br />4 1. The Board shall consider the application within a reasonable amount of time. <br />2. If the Preliminary Plan is approved by the County Commissioners the applicant shall have <br />one (1) year to prepare and file a Final Plat or to request a one-year extension from the <br />Planning Director. <br />RECOMMENDATION(S): Administration Recommends Approval, in accordance with the <br />attached Resolution of Approval. <br />Planning Board Recommends Approval, in accordance with the <br />attached Recommendation which corresponds with the Resolution of <br />Approval. <br />Planning Staff Recommends Approval, in accordance with the <br />attached Resolution of Approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.