Orange County NC Website
IN WITNESS WHEREOF, each of the parties to this agreement has caused the same <br />to be executed the day and year first above written. <br />ATTEST OR WITNESS: <br />DEPARTMENT OF TRANSPORTAIION <br />BY: <br />Asst• Manager of Right of ay <br />Second Party <br />INSTRUCTIONS <br />When the applicant is a corporation or a municipality, this agreement moist have <br />the corporate seal and be attested by the corporation secretary or by the <br />empowered city official, unless a waiver of corporate seal and attestation by <br />the secretary or by the empowered City official is on file in the Raleigh <br />office of the Manager of Right of Way. In the space provided in this agreement <br />for execution, the name of the corporation or municipality shall be typed above <br />the name, and title of all persons signing the agreement should be typed directly <br />below their signature. <br />When the applicant is not a corporation, then his signature must be witnessed <br />by one person. The address should be included in this agreement and the names <br />of all persons signing the agreement should be typed directly below their <br />signature. <br />This agreement must be accompanied, in the form of an attachment, by plan or <br />drawings showing the following applicable information: <br />1. All roadways and ramps. <br />2. Right of way lines and where applicable, the control of access <br />lines. <br />3. Location of the proposed encroachment. <br />4. Length and type of encroachment. <br />5, Location by highway survey station number. If station number <br />cannot be obtained, location should be shown by distance from <br />some identifiable point, such as a bridge, road, intersection, <br />etc. (To assist in preparation of the encroachment plan, the <br />Department's roadway plans may be seen at the various Highway <br />Division Offices, or at the Raleigh office.) <br />6. Drainage structures or bridges if affected by encroachment. <br />7. Typical section indicating the pavement design and width, and <br />the slopes, widths and details for either a curb and gutter or a <br />shoulder and ditch section, whichever is applicable. <br />8. Horizontal alignment indicating general curve data, where appli- <br />cable.. <br />9. Vertical alignment indicated by percent grade, PJ station and <br />vertical curve length, where applicable. <br />10. Amount of material to be removed and /or placed on NCDOT right of <br />way, if applicable. <br />11.. Cross - sections of all grading operations, indicating slope ratio <br />and reference by station where applicable. <br />12. All pertinent drainage structures proposed. Include all hydraulic <br />data, pipe sizes, structure details and other related information. <br />13. Erosion and sediment control. <br />14. Any special provisions or specifications as to the Perin mace <br />of the work or the method of construction that may be required <br />by the Department must be shown on a separate sheet attached to <br />encroachment agreement provided that such information cannot be <br />shown oa plans or drawings. <br />15. The Department's Division Engineer should be given notice by the <br />applicant prior to actual starting of installation, included in <br />this agreement. <br />16. Method of handling traffic during construction where applicable. <br />17 .. Scale of plans, north arrow, etc. <br />