Browse
Search
Agenda - 12-01-1987
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1987
>
Agenda - 12-01-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 2:21:28 PM
Creation date
10/4/2016 4:30:05 PM
Metadata
Fields
Template:
BOCC
Date
12/1/1987
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II• Duties <br /> The county organization would be asked in the beginning to <br /> pursue a definite set of goals on behalf of the citizens. These <br /> derive from needs which are poorly addressed by the mechanisms <br /> which we now have in place. They may be broken into several <br /> categories for consideration: <br /> A. Water Resources Planning <br /> Two areas of long-term planning are of immediate concern: <br /> A new reservoir in the upper Eno watershed must be planned in <br /> detail , and the necessary land accuisitions begun. Its <br /> integration with the land use plan is essential with respect to <br /> watershed protection, economic development and recreational <br /> facilities. Simultaneously, this county agency needs to negotiate <br /> with neighboring jurisdictions to establish our place in the <br /> regional system that is beginning to emerge. These negotiations <br /> should result in viable interconnections of our lines with Mebane <br /> and Graham on the west, with Durham on the east, and with Chatham <br /> County on the south. our role in the ultimate allocation of water <br /> from Jordan Lake and, in measure, to insure its purity should be <br /> guaranteed. <br /> Cf 'possibly immediate concern is the re-Presentation of the <br /> county in negotiations with the state government relating to the <br /> capacity use designation of the zipper Eno watershed. 'Whether or <br /> not this area is so designated, this agency should be <br /> responsible for putting into place operating procedures to <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.