Orange County NC Website
048 <br /> 2 <br /> security instruments or the security instruments may be <br /> renegotiated based on the "yet to do" portion of the <br /> improvements. <br /> 2 . Security shall be provided for the replacement of dead or <br /> damaged landscaping plants and planting of Loblolly Pines in <br /> the Reforestation Area. <br /> 3 . Roads. parking areas and landscaping shall be maintained as <br /> constructed. All such improvements and facilities shall <br /> further be maintained and operated in a safe manner. <br /> 4. Screening and landscaping requirements shall be provided as <br /> required in Articles 7 and 12 and shall be maintained as <br /> constructed. including the replacement of dead or damaged <br /> plant materials. <br /> 5 . The five percent (5%) interior landscaping requirement of the <br /> vehicular use area shall be constructed as shown on the <br /> approved site plan. <br /> 6 . A final boundary survey of the Planned Development and <br /> improvements shall be recorded by the developer. <br /> 7 . The final site plan and narrative of the project. incorporat- <br /> ing all changes. deletions and additions through the final <br /> approval of the project. are to be incorporated herein and <br /> made a part of this Planned Development Special Use Permit. <br /> Copies of the final site plan and narrative are to remain on <br /> file with the Orange County Planning Department. Any <br /> applicable permits. upon application. will be issued after <br /> approval and recordation of the Special Use Permit. <br /> 8 . The development shall be built and operated according to the <br /> site plan and written narrative supplied by the developer and <br /> in compliance with the above conditions. <br />